Laserfiche WebLink
J/1 Bonestroo <br />Rosene <br />^ B Anderlik & <br />^ I Associates <br />Engineers & Architects <br />Bonestroo. Rosene. Anderfik end Associates. Inc. is an Afrirmative Action/Equal Opportunity <br />Employer and Employee Owned v\ <br />principals; Otto G Bonestroo. PE • Marvin L Sorvaia. PE. • Glenn R Cook. P.E • <br />Robert G Scnunicm. P£ • Jerry A. Bourdon. PE <br />Senior Consultants: Robert W Rosene. PE • Josech C Anderiik. PE. • Richard E Turner. PE • <br />Susan M. Eberlin. C.PA. <br />August 14. 2000 <br />Associate Principals: Howard A. Sanford. P.E. • Keith A. Gordon. PE. • Robert R. Pfeffcrie. PE. • <br />Richard W Foster. PE. • David O Loskota. PE • Robert C. Russek. A.I A. • Mark A. Hanson. PE • <br />Michael T. Rautmann. PE • Ted K Field. PE • Kenneth P Anderson. PE • Mark R. Rolfs. PE. • <br />David A. Bonestroo. MSA* Sidney P Williamson. PE.. LS • Agnes M Ring. MBA* Allan Rick Schmidt. PE. <br />Offices: St Paul. St Cloud. Rochester and Willmar. MN * Milwaukee. Wl <br />\MEbsite: www bonestroo com <br />Mr. Paul Weinberger <br />Zoning Administrator/Planner <br />City of Orono <br />Post Ofrice Box 66 <br />Crystal Bay. MN 55323 <br />Re;Van Eeckhout Subdivision <br />File No. 139-2550 <br />Dear Paul; <br />We have reviewed the revised preliminary plat for the proposed seven lot Van Eeckhout subdivision. The site is located <br />east of South Brown Road, south of Long Lake and north of the Luce Line trail in the northeast quarter of Section 3. We <br />have the following comments in regards to engineering matters. <br />1. Acccss/Strects: The proposed access to the site is via Apple Glen Road in the City of Long Lake. Apple Glen <br />Road is accessed off of Watertown Road. The total length of the cul-de-sac from Watertown Road is <br />approximately 1600 feet where City code allows a ma.ximum cul-de-sac length of 1000 feet. Plans should be <br />submitted to the City of Long Lake for their review and comment. The proposed typical street section shows 24 <br />feet of paved width with no shoulders. We recommend that the street section be revised to include 3-foot gravel <br />shoulders as required by City standards. The street section should provide for a minimum of 8-inches of Class 5 <br />aggregate base and geotextile stabilization fabric if necessary. We recommend I inches of Type 41 <br />bituminous wear course and 2 inches of Type 31 bituminous base course. A geotechnical evaluation and R- <br />value recommendation should be provided to verify the street design. <br />2. Grading: The grading and erosion control plan should include erosion control measures to protect the existing <br />wetland. The erosion control plan may need to incorporate bale checks and fiber blanket in the ditches and <br />along steeper slopes. A wetland mitigation plan should be implemented for any wetland filling. Erosion control <br />measures should be in place prior to any grading, particularly along the wetland. Additional erosion control will <br />be needed during construction of the houses. <br />3. Drainage: The draft version of the City’s’ Comprehensive Storm Water Management Plan (SWMP) shows that <br />the site lies within the Tanager Lake drainage district. Long Lake Creek, a Mn DNR protected waterway, flows <br />through the site. Plans should be submitted to the Mn DNR and the Minnehaha Creek Watershed District <br />(MCWD) for review and approval. Proposed ponds should meet NURP standards. All proposed ponds should <br />specify normal water level (NWL) and high water levels (HWL). The final plans should include final pond <br />grading including a 10:1 aquatic bench lO-feet wide at the pond NWL. The pond design should also include an <br />outlet structure that provides 1-foot of skimming to remove floatables and debris. Skimming should be <br />provided to the pond HWL. Storm sewer design including outlet structure details should be provided for review. <br />Best Management Practices (BMP’s) should be implemented on all areas where storm water cannot be routed <br />directly to a pond. A drainage area map, storm sewer and ponding calculations should be provided with the <br />final plan set <br />4. Sanitary Sewer: "The City of Long Lake should be consulted regarding proposed connections to their sanitary <br />sewer system. A written sewer agreement between the Cities of Long Lake and Orono will be required. The <br />developer should provide detailed sanitary sewer design including plan and profile sheets. The City of Orono <br />should review the sanitary sewer needs along South Brown Road (existing home west of Lot 1, Block 2) and <br />determine whether the sewer should be extended to the westerly boundary of Outlot A. <br />5, Easements: Drainage and utility easements should be provided 5 feet wide along all interior lot lines and 10 <br />feet wide along the roadway right-of -ways. Drainage easements should be provided across all wedand, <br />drainage way and pond areas. <br />2335 West Highway 36 • St. Paul, MN 55113 • 651-636*4600 • Fax: 651-636-1311 J