Laserfiche WebLink
F) Each and every landscaped area with an underliner (whether the underliner <br />is impervious or not), regardless of whetrher the area is covered with woodchips, <br />stones, dirt or plants; <br />Any swimming pool or wading pool; <br />H) Any tennis court covered with concrete, asphalt or clay, but not any tennis <br />court covered with grass. <br />4.Lot Coverage. Per Ordinance 80, 2nd Series adopted February 26,1990, the total <br />combined footprint areas of all principal and accessory structures shall not exceed 15% <br />of lot area. The following shall be included in calculation of lot coverage by structures: <br />a) <br />b) <br />all roofed structures which extend more than 6* above grade level; <br />tennis courts, patios, decks and all similar open structures when partially or <br />fully enclosed by fences, railings or walls which extend more than 6* above <br />grade level (if any portion of such structure extends more than 6' above grade <br />level, the entire structure shall count towards lot coverage); <br />pools, including pool basin and associated deck or patio areas, regardless of <br />whether such pool basin, deck or patio is enclosed with a fence. <br />5. <br />6. <br />7. <br />All lots shall be provided with a functional means or method of backing out. The City <br />will not approve the backing out of motorued vehicles onto Sugarwood Drive. <br />For all applicants who find they cannot meet the required standards for development <br />within the Sugar Woods Planned Residential Development, please refer to Attachment <br />B for special directions. <br />Written confirmation from Rebers Construction that the building plans and site plan <br />have been approved by the Architectural Review Committee for Sugar Woods. <br />At the time a Certificate of Occupancy is issued for a new dwelling within the subdivision <br />of Sufjar Woods, the City has agreed to execute and deliver to the owner of each lot a partial release <br />of suMivider's agreement for that lot. Upon the recordation of such partial release of subdivider's <br />agreement, the Registrar of Titles is authorized and instructed to remove from the Certificate of Title <br />for the lot, the memorial of this instrument and the memorial of the partial release of subdivider’s <br />agreement. <br />Please contact the Building and Zoning Department (473-7357) if you have any questions <br />concerning the directives listed above. <br />Prior to any site preparation, tree cutting, land alterations or construction, the Building <br />Setback Area must be defined on the site with plastic or wooden snow fencing. This fencing <br />must remain on the site until a representative of the Orono Building Department provides <br />written confirmation that fencing mav be removed. <br />■1