Laserfiche WebLink
1/1 Bonestroo <br />Rosene <br />^5 Anderlik& <br />|\ \ Associates <br />Engineers & Architects <br />Bonesrrco. ffosene. Anderhk and Associates, me. ts an Affirmative Action/Bquat Opportunity Employer <br />Principals 0::o G. Bonc.iroo. PE. • Joseph C. Anderiik. Pg. • Marvm L Sorvaia. PE. • <br />Glenn R. Cook. PE. • RoPert G Scrunicht. Pg • Jerry A. Bourdon. Pg • <br />RoOert JJ Rosene. PE.. Richard E Turner. Pg. and Susan M gperim. C PA. Senior Consuttancs <br />Associate Principals: kiowatd A. Sanford. PE. • Keith A. Gordon. PE. • Rooert R. Pfefferie. PE. • <br />Richard W Foster. PE. • David O Loskota. PE. • Robert C. Russek. A.I.A. • Mark A. Hanson. PE. • <br />Michael T. Rautmann. PE. • Ted K.Fieid. PE • Kenneth P Anderson. PE • Mark R. Rolfs. PE. • <br />Sidney P Jt^iiiiamsoa PE.. LS. • Robert F Kotsmith • Agnes V Ring • Allan Rick Schmidt. PE. <br />Offices: Sr. Paul. Rochester. Wilimar and St Cloud. MN • .Milwaukee. Wl <br />Wedsite w ww bonestroo com <br />March 16,2000 <br />^>1^ 17 mMr. Paul Weinberger <br />Zoning Administrator/Planner <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay. MM 55323 <br />Re: Walfred Properties/Snyders Site <br />File No. 139GEN-2567 <br />Dear Paul: <br />We have reviewed the preliminary grading and utility plan for the proposed Snyders site in Navarre. The site <br />is located on the east side of Shady wood Road (CSAH 19) and north of Navarre Lane and Shoreline Drive <br />(CSAH 15). We have the following comments in regards to engineering matters: <br />1. Overall: The scale shown on the plan set (1 ”=30’) does not agree with the dimensions shown on the <br />drawing (sanitary sewer lengths), it appears that the drawing was plotted at some other scale. For this <br />reason we were unable to verify such things as parking lot grades, pipe inverts, pond capacities, etc. Once <br />a revised scalable drawing is submitted we will complete our review. <br />2. Sanitary Sewer: The existing sanitary sewer is shown through the proposed ponding area. The plans <br />show a proposed realignment of the sewer through this area. The revised alignment shows the sewer <br />approximately 7-feet away from an existing water main where 10-fcet is the standard. The sewer should <br />be relocated outside the normal water level (NWL) of the pond. Plans should be submitted to the <br />Department of Health for their approval. The proposed sewer realignment falls outside the property. <br />Additional land or easements will need to be acquired to construct the pond and sanitary sewer. The <br />sanitary sewer should have a minimum of 6-feet of cover or should be insulated. All sanitary and storm <br />sewer manholes are required tc have an exterior sealing sleeve as manufactured ’»y Infi-Shield or an <br />approved equal. Any connections to existing manholes shall be core drilled and a rubber boot installed. <br />All applicable City Standard Details should be included in the final plan set. <br />3. Grading: We recommend that access and parking lot grades not exceed 4^. The proposed design may <br />be within these parameters but we cannot verify until we get a scalable plan. The proposed retaining walls <br />are nearly 20-feet tall in some locations. Retaining wall design and details should be provided for review. <br />A two tier wall design may be necessary' where wall heights approach 20 feet. Some type of barrier will <br />be necessary abov e the wall in some locations for safety purposes. <br />I'I <br />UI r or OrlOiVO <br />Drainage/Ponding: As previously stated, the proposed pond lies outside the property boundaries, the <br />applicant should provide details as to how the pond can be constructed and how it may impact the existing <br />wetland. The pond should be sized according to NURP standards using a 2.5-inch rainfall over the <br />contributing drainage area. Calculations submitted used a 2-inch rainfall and should be revised. The pond <br />will require an outlet structure capable of providing 1-foot of skimming as shown in City Standard Detail <br />STO-8A. The pond should be constructed in accordance with City Standard Detail STO-12. Pond and <br />storm sewer calculations should be revised and resubmitted along with a drainage area map. It is unclear <br />where the proposed catch basin on the north side of the site drains to. Riprap should be provided at all <br />outlets. Storm sewer should be reinforced concrete pipe. Final plans should show plan and profile views <br />2335 West Highway 36 • St. Paul, MN 55113 • 651-636-4600 ■ Fax; 651-636-1311 <br />n <br />.1