My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2000 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2000
>
02-23-2000 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 3:50:29 PM
Creation date
3/16/2023 3:45:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. <br />There are several options with this application. They are as follows; <br />1. Planning Commission votes on the application as submitted, with variances for average <br />lakeshore setback and side yard setback, subject to the applicant receiving approval from the <br />Septic Inspector for encroachment into the secondary drainfield site. Staff does not <br />recommend approval of the variances. <br />The applicant moves the pool out of the sideyard setback, still requiring a variance for <br />average lakeshore setback. This would also require approval of the Septic Inspector. Staff <br />is willing to recommend approval of the average lakeshore setback variance, however, they <br />still feel that the Septic Inspector would not allow the structure within the secondary <br />drainfield. <br />The applicant requests the matter be tabled, to allow them the opportunity to work with the <br />original septic designers to find an alternative secondary site. If this is successful and <br />receives approval from the septic inspector, then the matter could come back to the Planning <br />Commission, with Staff recommending approval of the average lakeshore setback to place <br />the pool (Staff would not recommend approval of the side yard setback variance). <br />3. <br />2. <br />Pertinent Ordinances: <br />1. Section 10.22, Subd. I, (B) No principal or accessory structure shall be located within 75 feet <br />of the lakeshore nor closer to the lakeshore than the average distance from the shoreline of <br />existing residence buildings on adjacent lots. <br />Section 10.03, Subd. 9, (E) Setbacks. Accessory structures in excess of 750 square feet <br />footprint area but not exceeding 1,000 square feet footprint shall be located at least 15 feet <br />from any lot line. <br />Please see the section from the Septic Ordinance defining setback requirements in the <br />exhibits. Please note that the Planning Commission does not have the authority to grants <br />variances to the Septic Code, only the Septic Inspector may approve the request. <br />3. <br />ANALYSIS <br />Lot Area and Yards <br />LR-IA Lot Area Lot Width Lakeside Yard Side Yard Street Yard <br />Required 2 Acres 200 ’75'30'50' <br />Proposed 2.7 Acres 245'78' (from pool <br />to OHWL) <br />29.9', 13'252' to shed, <br />282.1'to house <br />•25/J Connit Piepho. 540 Sorth Arm Drivt <br />yarUuKts <br />August 9, 1999 <br />pagt-2
The URL can be used to link to this page
Your browser does not support the video tag.