My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2000 Council Packet
Orono
>
City Council
>
2000
>
12-18-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 10:09:18 AM
Creation date
3/15/2023 10:08:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BON^TROO ROSENE ANDERLIK U ©6516361311 12/12/00 09:17 S :03/04 NO:822 <br />m <br />No. <br />1 <br />2 <br />3 <br />Itom <br />Pan 1 • Eroalon Control and Silt <br />Gradlng/Flnal Shaping <br />Silt fence, regular <br />Protection of catch basin, non-street <br />Site grading/final shaping <br />Total Part 1 • Erosion Control and Site <br />Orading/FInal Shaping <br />4 <br />5 <br />fl <br />7e <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />18 <br />17 <br />18 <br />10 <br />20 <br />Pan 2 • Park Improvtmanta <br />4* HOPE dralntOe with fabric sock <br />8* HOPE draintlle wilh fabric sock <br />8' DIP outlet piping <br />Outtat screen <br />Fioldslone rip rap (8*-18‘) <br />Concreto play area curbing |8*x18*) <br />S' concreto pavement <br />Synthetic resUent surfacing <br />Drainage aggregate (CV) <br />Oaotoxtle Flltor <br />Recycled rubber Hlea [3'x3 ’) <br />Engineered vrood fiber mulch (LV) <br />Play structures (complete) <br />Swings (oompleto) <br />Bltumin^ pathway <br />Sodding, lawn type <br />Seeding (shady mix) <br />Total Part 2 • Park Improvements <br />Change Order Number 1 <br />1 <br />2 <br />3 <br />Water service and yard hydrant aa described in <br />' Propoeal Raqusel No. 1 <br />Concreto play area curbing (B'x18*] - Deduct <br />fromconIracL <br />Modified concrete play are curbing <br />' Total Change Order No. 1 <br />Total Part i - Eroalon Control and Site <br />Oradins/FInat Shaping <br />Total Pert 2 • Park Improvementa <br />Total Change Order No. 1 <br />Total Work Completed To Date <br />illljtt <br />Unit <br />Contract <br />Quantity <br />Unit Quantity <br />Price to Dale <br />Amount <br />to Date <br />LF 150 5.00 SO.OO <br />EA 1 260.00 1 8230.00 <br />L6 1 5000.00 <br />• <br />0.75 __53.750.00 <br />S4.CCOOO <br />LF 200 10.00 195 81.950.00 <br />LF'42 11.00 42 846Z00 <br />LF 20 20.QQ 20 8400.00 <br />L8 1 100.00 SO.OO <br />CY 0.25 1000.00 80.00 <br />LF 278 35.00 SO.OO <br />8F-291 7.00 SO.OO <br />8F 276 20.00 80.00 <br />CY 65 15.00 65 8825.00 <br />8Y 540 1.00 540 8540.00 <br />EA 10 65.00 10.00 <br />CY 220 25.00 220 85,500.00 <br />LS 1 1 860.000.00 <br />LS 1 3000.00 1 83.000.00 <br />8Y.230 31.50 100 83.150.00 <br />SY 300 3.00 80.00 <br />AC <br />• • <br />0.6 200.00 <br />■ <br />SO.OO <br />885.827.00 <br />LS 1 6000.00 0.9 85.400.00 <br />LF 278 •35.00 S0.00 <br />LF 276 17.60 267___84.872.50 <br />Si 0.072.50 <br />14,000.00 <br />S85.827.00 <br />Si 0.072.50 <br />879.899.50
The URL can be used to link to this page
Your browser does not support the video tag.