Laserfiche WebLink
ORONO CITY COUNCIL MEETING <br />MINUTES FOR JUNE 14,1999 <br />(U9) M2480SPRING HILL GOLF CLUB, 725SIXTH AVENUE NORTH-FINAL PLAT <br />APPROVAL - Continued <br />completed quickly. He questioned the request to put the trail in up to the wetland. He understood <br />that it was to be completed up to the maintenance facility. <br />Flint said the contract provides that the trail will be put in up to the wetland. <br />Crosby agreed, but he thought that subsequent discussions had it only going to the driveway. <br />Flint said that is Tim Johnson’s side of the discussion, but the City said no, build it to the <br />wetland. He said that on die description of the easement, he wants it left as a ten-foot easement. <br />He said the agreement provides for a four-foot trail. If the easement is defined as the middle of <br />the four-foot trail, it would be virtually impossible for anyone to maintain the trail because you <br />need room on either side. <br />Crosby said he would not have a problem with saying two feet, together with the maintenance. <br />He said the issue is for a subsequent Council that looks at this thinking they have all this space <br />and dien want to reroute the trail. <br />Flint said the trail has already been moved because the original plan for the trail that the City had <br />.was to go on the golf course side of the weUand in the area of East Long Lake Road md Spring <br />Hill Road. Thcr'r was great concern about that by die golf course because of safety reasons. The <br />City b-:V..t^4l i'-ff ic the po*lnt of taking the ten-foot easement along the edge and having a littie <br />flexibility Icr the trail. He wants to stay with the original agreement. <br />Barrett asked if there should be two descriptions, one of the easement and one of the trail. <br />Flint thought the agreement contemplated that the easement would be ten feet except where the <br />trail actually goes further. <br />Crosby said that is what the legal description says. <br />1 <br />Jabbour said the original agreement wras for a ten-foot easement to run parcel to the property <br />line. When the City staff and the golf course staff visited the site, they could see that there was a <br />natural direction for the trail that would preserve trees which was beyond the ten feet He asked if <br />they were saying that in that area, they do not want the City to have the ten feet that they are not <br />using plus all the area beyond the ten feet because at some places it could be as wide as 30 feet • <br />He asked if Crosby would rather describe the easement based on the existing trail plus two feet <br />on each side it <br />Crosby said that in the area where the trail has not been constructed, he would describe the center <br />line, give two feet on each side of the center line and some additional area for maintenance <br />rights. He said the reason for that is to avoid someone coming in at a later date <br />P-' <br />Page 15