My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-2000 Council Packet
Orono
>
City Council
>
2000
>
12-11-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 10:17:08 AM
Creation date
3/15/2023 10:06:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'-I • <br />MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, November 20,2000 <br />request to permit construction of an accessory structure between the principal structure and the <br />front property line. <br />Weinberger stated the Applicant is requesting vacation of the platted alley. The alley presently <br />is undeveloped and has not been used for public travel. The only public purpose the alley <br />currently serves is to provide sewer service. The City of Orono does not intend to develop or <br />maintain this alley. A portion of the alley would not be vacated because it serves as the only <br />public access for the lot located at 1140 Loma Linda. A condition of the vacation would require <br />an access and utility easement over the portion of the vacated alley that is used for sewer <br />service. Weinberger stated vacation of the alley may be justified since it does not serve a <br />public service outside of the sewer service. <br />Weinberger stated if the vacation of the alley is approved, tne lot line rearrangement would be <br />between the two parcels shown as Parcel A and Parcel B. Parcel B is currently developed with <br />a cabin consisting of appro.ximately 500 square feet in size. The second parcel is currently <br />vacate, with a possible request in the future to construct a st.n:crure on this property. Weinberger <br />stated half of the vacated public alley would be transferred to Parcel A, with the other half being <br />vacated. <br />Weinberger stated there are four parcels in common ownership in this area by the same property <br />owner, with an amendment being completed to allow the entire 20 feet of the vacated alley to <br />become part of Parcel A. Weinberger stated a portion of the \acated alley would also be <br />• • • <br />transferred to Parcel B, with a small portion of Parcel A becoming a part of Parcel B as part of <br />the lot line rearrangement. Weinberger stated Parcel B would be increased by 30 feet and would <br />result in a developed 8,500 square foot parcel. Parcel A would increase in size by appro.ximately <br />1,500 square feet. <br />Weinberger stated both parcels would be developed subsequent to the-vacation and lot line <br />rearrangement, with both lots being under the minimum one acre requirement for this district. <br />PAGE 16 <br />■* <br />rfhurii Jlrh
The URL can be used to link to this page
Your browser does not support the video tag.