Laserfiche WebLink
b <br />•• <br />1 <br />\ <br />4410.40(](p TIERED E18. <br />An RGu\may use a series of tiered EISs to fulfill <br />environmen^l review requirements for an action where decisions <br />on which alt^native to select must be made in stages, <br />proqressinq fr^m the general to the specific.^^^^^lor to each <br />decision which w6i^d eliminate from further^c^sideration any <br />aXternatives under''qonsideration» a tier^d^ElS must be completed <br />which addresses the i^ues and altern^HTives relevant to the <br />decisions to be made inNt;hat tierj/^ft a level of detail <br />appropriate to that tierof detail in earlier tiers <br />need not be as great as tha^M^ later tiers, provided that it is <br />sufficient to reasonably liifornN^cision tuakers of the <br />significant environment'!, economic, employment, and <br />sociological in.pact'^^ the choices in^e in that tier. <br />The procedures/^or preparing tiered K^Ss shall be the same <br />as those for a^egular EIS, as specified ir^parts 4410.2100 to <br />4410.3000. <br />A tiet^EIS may incorporate by reference material <br />developefa in an earlier tier. <br />SA: MS s 116D.04; 116D.045 <br />21 SR 1458 <br />MANDATORY CATEGORIES <br />.1 <br />\ <br />4410.4300 MANDATORY EAW CATEGORIES. <br />Subpart 1. Threshold test. An EAW must be prepared for <br />projects that meet or exceed the threshold of any of subparts 2 <br />to 37, unless the project meets or exceeds any thresholds of <br />part 4410.4400, in which case an EIS must be prepared. <br />If the proposed project is an expansion or additional stage <br />of an existing project, the cumulative total of the proposed <br />project and any existing stages or components of the existing <br />project must be included when determining if a threshold is met <br />or exceeded if construction was begun within three years before <br />the date of application for a permit or approval from a <br />governmental unit for the expansion or additional stage but <br />after April 21, 1997, except that any existing stage or <br />component that was reviewed under a previously completed EAW or <br />EIS need not be included. <br />Multiple projects and multiple stages of a single project <br />that are connected actions or phased actions must be considered <br />in total when comparing the project or projects to the <br />thresholds of this part and part 4410.4400. <br />Subp. 2. Nuclear fuels zuid nuclear waste. Items A to F <br />designate the RGU for the type of project listed; <br />A.For construction or expansion of a facility for <br />the storage of high level nuclear waste, the EQB shall be the <br />RGU. <br />B.For construction or expansion of a facility for <br />the storage of low level nuclear waste for one year or longer#