My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2000 Council Packet
Orono
>
City Council
>
2000
>
11-13-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 10:12:30 AM
Creation date
3/15/2023 10:05:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'BONESfTROO ROSENE ANDERLIK3 W 6516361311 <br />No.Itom <br />Part 1 • Hwy 12 Releif Lift Station <br />1 Highway 12 relief lift staion <br />2 Valve manhole, Including meter <br />3 Flow control manhole, including weir plate <br />4 8” DIP eanitary sewer <br />5 8" PVC sanitary sewer <br />0 4" DIP forcemain <br />7 4''DIP bends <br />8 12” X 4" wet tap w/valve <br />9 Cut in 12” X 4” tee w/vatve <br />10 SeedwAopsoil <br />11 SeedwAopsoil <br />12 Class 5 aggregate base <br />Total Part 1 - Highway 12 Relief Lift Station: <br />Part 2 • West Ferndate Lift Stations <br />13 Lift Station No. 2 rehabilitation Incl. gravity manhole <br />14 Lift Station No. 3 rehabiiltalion <br />15 Lift Station No. 4 rehabilitation <br />16 Lift Station No. 5 rehabilitation <br />17 Gravity sewer MH <br />18 Connect to existing T PE FM <br />19 2"HDPEFM <br />20 Core drill and Install 2" FM Into existing MH 432 <br />21 4" or 6" PVC service pipe <br />22 Granular borrow <br />23 Class 5 aggregate base <br />24 Class 5 aggregate base, 100% crushed llmerock <br />25 Bituminous base <br />26 Bituminous wear <br />27 SeedwAopsoil <br />28 SodwAopsoil <br />29 Furnish and Install Evergreen Tree (blue spruce and <br />arborvltae) 6' high <br />Total Part 2 - West Femdale Lift Slaliops: <br />Total Part 1 • Highway 12 Relief Lift StaUon: <br />Total Part 2 • West Femdale Lift Stattons: <br />Total Work Completed To Date <br />11/08/00 11:06 0 -.03/04 NO:242 <br />Contract Unit Quantity Amount <br />Unit Quantity Price to Date to Date <br />LS 1 $74,000.00 1.00 $74,000.00 <br />LS 1 $8,200.00 1.00 $8,200.00 <br />LS 1 $4,000.00 1.00 $4,000.00 <br />LS 1 $600.00 2.00 $1,200.00 <br />LF 10 $45.00 10.00 $450.00 <br />LF 55 $23.00 55.00 $1,265.00 <br />EA 4 $60.00 6.00 $480.00 <br />LS 1 $1,500.00 1.00 $1,500.00 <br />LS 1 $2,200.00 1.00 $2,200.00 <br />SY 100 $2.50 200.00 $500.00 <br />SY 200 $2.50 300.00 $750.00 <br />TN 30 $15.00 75.74 $1,136.10 <br />$95,681.10 <br />LS 1 $121,641.00 1.00 $121,641.00 <br />LS 1 $23,000.00 1.00 $23,000.00 <br />LS 1 $23,000.00 1.00 $23,000.00 <br />LS 1 $25,000.00 1.00 $25,000.00 <br />LS 1 $1,000.00 1 $1,000.00 <br />EA 7 $500.00 7 $3,500.00 <br />LF 100 $10.00 40 $400.00 <br />LS 1 $850.00 1 $850.00 <br />LF 60 $30.00 40.00 $1,200.00 <br />TN 100 $9.00 156.70 $1,410.30 <br />TN 75 $14.00 48.68 $681.52 <br />TN 15 $14.00 $0.00 <br />TN 30 $90.00 $0.00 <br />TN 30 $^.00 $0.00 <br />SY 200 $2.50 $0.00 <br />SY 300 $2.50 $0.00 <br />EA 12 $200.00 $0.00 <br />$201,662.82 <br />$95,681.10 <br />$201,682.62 <br />$297,383.92 <br />,n. • <br />.1- <br />c <br />*r-‘ <br />I <br />.>! <br />•*. <br />I • <br />'A <br />Ui <br />. :• <br />It <br />*1 <br />•ti <br />r- L**r* <br />■if. <br />•y <br />N'*•*11^4 <br />.:2 <br />■li <br />■■“S’• 2i • <br />■t: <br />;j!r- <br />.:H: <br />r.:. <br />•'■rl • <br />te. <br />■i- <br />1
The URL can be used to link to this page
Your browser does not support the video tag.