Laserfiche WebLink
‘ BONESTROO ROSENE ANDERLIK3 ©6516361311 10/03/00 11:43 0:03/04 N0:489 <br />No. <br />1 <br />2 <br />Itam <br />Part 1 • Hwy 12 Ralalf Ufl Station <br />Highway 12 relief lift staion <br />Valve manhole, including meter <br />3 Flow control manhole, Including weir plate <br />4 6” DIP sanitary sewer <br />5 6* PVC sanitary sewer <br />6 4* DIP forcemain <br />7 4" DIP bends <br />8 12” X 4" wet tap w/valve <br />0 Cut in 12* X 4” tee wAralve <br />10 SeedwAopsoil <br />11 Seed wAopsoii <br />12 Class S aggregate base <br />Contract Unit Quantity Amount <br />Unit Quantity Price to Date to Date <br />LS 1 $74,000.00 1.00 $74,000.00 <br />LS 1 $8,200.00 1.00 $8,200.00 <br />LS 1 1.00 $4,000.00 <br />LS 1 $600.00 2.00 $1,200.00 <br />LF 10 $45.00 10.00 $450.00 <br />LF 55 $23.00 55.00 $1,265.00 <br />EA 4 $S0.00 6.00 $480.00 <br />LS 1 $1,500.00 1.00 $1,500.00 <br />LS 1 $2,200.00 1.00 $2,200.00 <br />SY 100 $2.50 $0.00 <br />SY 200 $2.50 $0.00 <br />TN 30 $15.00 $0.00 <br />Total Part 1 - Highway 12 Relief Lift Station:$93,205.00 <br />Part 2 • West Ferndale Lift Stations <br />13 Lift Station No. 2 rehabilitation incl. gravity manhole LS 1 $121,641.00 0.65 $115,558.95 <br />14 Lift Station No. 3 rehabilitation LS 1 $23,000.00 1.00 $23,000.00 <br />15 Lift Staton No. 4 rehabilKaUon LS 1 $23,000.00 1.00 $23,000.00 <br />16 Lift Staton No. 5 rehabllKaton LS 1 $25,000.00 1.00 $25,000.00 <br />17 Gravity sewer MH LS 1 $1,000.00 1 <br />16 Connect to existing 2 ” PE FM EA 7 $500.00 4 $2,000.00 <br />19 2 ’HOPEFM LF 100 $10.00 25 $250.00 <br />20 Core drill and install 2 ” FM Into existing MH 432 LS 1 $850.00 $0.00 <br />21 4” or 6* PVC service pipe LF 60 $30.00 40 $1,200.00 <br />22 Granular borrow TN 100 $6.00 142.40 $1,261.60 <br />23 Class 5 aggregate base TN 75 $14.00 35.00 $490.00 <br />24 Class 5 aggregate base, 100% crushed limerocK TN 15 $14.00 $0.00 <br />25 Bituminous base TN 30 $90.00 $0.00 <br />26 Bituminous wear TN 30 $95.00 $0.00 <br />27 .See-] y/AopSoil SY 200 $2.50 $0.00 <br />26 SodvvAopsoil SY 300 $2.50 $0.00 <br />29 Furnish and install Evergreen Tree (blue spruce and <br />arborvltae) 6' high <br />Total Part 2 • West Ferndale Lift Stadons: <br />Total Part 1 • Highway 12 Relief Lift Station: <br />Total Part 2 • West Ferndale Lift Stations: <br />Total Work Completed To Date <br />EA 12 $200.00 $0.00 <br />$192,780.55 <br />$93,295.00 <br />$192,780.55 <br />$266,075.55 <br />»• <br />i!i <br />• • r! <br />JiirV <br />•*. <br />“ip <br />ir <br />• • <br />;• <br />.IT.i!| <br />; i* <br />.. •:!:•! <br />I. <br />•ir <br />•' I •/i <br />. T <br />"li <br />ir <br />t ? <br />I <br />1'i! <br />■I <br />h!t <br />cr <br />i <br />i <br />h