Laserfiche WebLink
15 <br />1/1 Bonestroo <br />Rosene <br />Ande rlik & <br />|\J I Associates <br />Engineers & Architects <br />August 15,2000 <br />Mr. Paul Weinberger <br />Zoning Administrator/Planner <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 55323-0066 <br />Re: Brenshell Homes 6-Lot Subdivision @ Garden Lane <br />BRA File No. 139-2596 <br />Bonestroo. Poiene. Anderlik and Associates. Inc. Is an Affirmative Action/Equal Opporlunicy <br />Employer and Employee Owned <br />Principals: Otto G Bonestroo, PE • Marvin L Sorvaia. PE • Gienr ? Cook. PE • <br />Robert G Schunichf. PE • Jerry A Bourdcn. PE <br />Senior Consultants: RoOert W Rosene PE • Joseph C Anderfik. PE • Richard E Turner. PE • <br />Susan .M, E&ertin. C PA. <br />Associate Principals: Howard A. Sanford. PE • Keith A Gordon. PE . Robert R. Pfef.'erle. PE • <br />Richard W Poster. PE • David O Loskota. PE • Robert C Russek. A i A. • Mark A Hanson. PE • <br />K* chaei T Rautmann. PE • Ted K Field PE • Kenneth P Anderson. PE. • Mark R Rolfs. PE. • <br />David A. Bonestroo. MBA* Sidney P W.itiamson PE. L S • Agnes M Rmg. MBA* Allan Rick Sc^*- <br />Offices: St Paul. St. Cloud Rochester and Wiiimar. MN • Milwaukee. Wl <br />M^bsite: wwwbcnestroo com <br />r:. PE <br />Dear Paul: <br />We have reviewed the preliminary plat for the proposed six-lot subdivision for Brenshell Homes. <br />The site is located east of Garden Lane and west of Wildhurst Trail in the west half of Section 7. We <br />have the following comments in regards to engineering matters. <br />1.Utilities: The proposed sanitary sewer installation raises some concerns. Sewer is proposed to <br />be installed in an existing steep slope between Lots 2 and 3 and also down the center of <br />Wildhurst Trail. Disturbance of the steep slope is a serious erosion concern. Installation of the <br />sewer in Wildhurst Trail will require the removal of the entire driving surface making through <br />traffic difficult if not impossible. We strongly recommend that the portions of the sewer between <br />Lots 2 and 3 and the segment along Wildhurst Trail be directionally bored to prevent disturbance <br />to the steep slopes and allow for through traffic during construction. Final plans should include <br />plan and profile views of the sanitary sewer. Record plans should be provided to the City upon <br />project completion. City standard details should be included in the plan set. <br />2.Streets: Plans should include a typical street section. A geotechnical analysis, R-value <br />recommendation and pavement design calculations should be submitted for review. It appears <br />that the street will be an urban section with curb and gutter. All curb and gutter shall be concrete, <br />no bituminous curb is allowed. The fire chief should review and comment on the proposed <br />hammer handle tum-around on Garden Lane. The chief should also look at the proposed <br />driveway alignment to serve Lot 5. Recent discussions with local firefighters indicate that long <br />curving driveways can be an obstacle for fire trucks. The City should review and determine <br />whether Garden Lane should be constructed further to the north to provide access the Saga Hill <br />Park. <br />3.Grading and Drainage: The proposed grading plan reduces the existing contributing drainage <br />area to the southerly ravine by about 2.5 acres. Storm sewer will redirect this drainage area to the <br />northerly ravine where the gradient is half as steep as the south ravine. This is consistent with <br />our previous comments. The developer ’s drainage calculations appear acceptable. Both ponds <br />reduce the off-site flows compared to predevelopment conditions. Both ponds should have outlet <br />structures constructed to City standards that provide skimming to the 100-year storm event. <br />Storm sewer design and calculations should be provided for review. Final plans should be <br />submitted to the Minnesota DNR and the Minnehaha Creek Watershed District for their review <br />and approval. <br />4.Easements: Drainage and utility easements should be provided 5-feet wide along all interior lot <br />lines and 10-feet wide along roadway right-of-ways. Drainage easements should be provided <br />2335 West Hlqhwav 36 • St. Paul, MN 55113 • 651-636-4600 • Fax: 651-636-1311