My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2000 Council Packet
Orono
>
City Council
>
2000
>
09-25-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:32:04 AM
Creation date
3/15/2023 9:28:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />meeting <br />SEP 2 5 2000 <br />DATE: Ai ast <br />ITEM NO.: <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Public Services Director’s Report <br />Item Description: Navarre Municipal Parking Lot Paving <br />The Council previously directed staff to initiate a project to repave the Navarre Municipal Parking <br />Lot. Council approval of funding for this project is required. The existing pavement is in poor <br />condition, mainly because of the age of the pavement, but the underlying base appears to be <br />structurally sound. <br />We are recommending reclaiming the existing pavement and regrading the parking lot. The <br />existing profile of the lot is uneven and there are cracks in the pavement. If the pavement is <br />simply overlain, the existing uneven profile and cracks will be reflected through the new <br />pavement. In the reclaiming process, a reclaiming machine is used to break up the pavement into <br />small pieces that can be graded to a smooth profile. This process also eliminates reflective <br />cracking through the new pavement. The project costs include funding for additional aggregate <br />base that may need to be added if soft spots are discovered in the existing base after reclaiming. <br />Midwest Asphalt Company will be completing this work for the bid prices that we obtained <br />through our annual competitive bidding process for road materials and street overlays. A cost <br />summary is listed below. <br />Reclaim Pavement and Grade Lot $10,000 <br />Overlay Parking Lot $35,000 <br />Additional Aggregate Base $5,000 <br />Total Cost $50,000 <br />The new parking lot light install ; h>i3 is tentatively scheduled for the week of September 28“* with <br />reclaiming and repaving scheduled for the week of October 2"^. The parking lot will need to be <br />closed when the reclaiming and repaving is completed. We will be installing advance warning <br />signs at the three lot entrances to alert people about the lot closing and will notify the businesses. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve reclaiming and repaving of the Navarre Municipal Parking Lot at a cost of <br />$50,000 to be funded from the "Infrastructure (road/bridge) projects" component of the PIR fund <br />and approval of a budget adjustment to reflect this expenditure.
The URL can be used to link to this page
Your browser does not support the video tag.