My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2000 Council Packet
Orono
>
City Council
>
2000
>
09-11-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:27:49 AM
Creation date
3/15/2023 9:24:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No. item <br />Part 1 • Hwy 12 Releif Lift Station <br />1 Highway 12 relief lift staion <br />2 Valve manhole, including meter <br />3 Flow control manhole, including weir plate <br />4 8" DIP sanitary sewer <br />5 8" PVC sanitary sewer <br />6 4" DIP fbrcemain <br />7 4" DIP bends <br />8 12" X 4" wet tap w/valve <br />9 Cut in 12" X 4" tee w/valve <br />10 Seed w/topsoil <br />11 Seed w/topsoil <br />12 Class 5 aggregate base <br />Total Part 1 - Highway 12 Relief Lift Station: <br />Part 2 ’West Femdaie Lift Stations <br />13 Lift Station No. 2 rehabilitation incl. gravity manhole <br />14 Lift Station No. 3 rehabilitation <br />15 Lift S>*''-" No. 4 rehabilitation <br />16 Lift Su.don No. 5 rehabilitation <br />17 Gravity sewer MH <br />18 Connect to existing 2" PE FM <br />19 2"HDPEFM <br />20 Core drill and install 2" FM into existing MH 432 <br />21 4" or 6" PVC service pipe <br />22 Granular borrow <br />23 Class 5 aggregate base <br />24 Class 5 aggregate base, 100% crushed limerock <br />25 Bituminous base <br />26 Bituminous wear <br />27 Seed w/topsoil <br />28 Sod w/topsoil <br />29 Furnish and install Evergreen Tree (blue spruce and <br />arborvitae) 6‘ high <br />Total Part 2 - West Femdaie Lift Stations: <br />Total Part 1 - Highway 12 Relief Lift Station: <br />Total Part 2 • West Femdaie Lift Stations: <br />Total Work Completed To Date <br />Contract Unit Quantity Amount <br />Unit Quantity Price to Date to Date <br />LS 1 $74,000.00 1.00 $74,000.00 <br />LS 1 $8,200.00 0.95 $7,790.00 <br />LS 1 $4,000.00 1.00 $4,000.00 <br />LS 1 $600.00 2.00 $1,200.00 <br />LF 10 $45.00 10.00 $450.00 <br />LF 55 $23.00 55.00 $1,265.00 <br />EA 4 $80.00 4.00 $320.00 <br />LS 1 $1,500.00 1.00 $1,500.00 <br />LS 1 $2,200.00 $0.00 <br />SY ICO $2.50 $0.00 <br />SY 200 $2.50 $0.00 <br />TN 30 $15.00 $0.00 <br />$90,525.00 <br />LS 1 $121,641.00 0.27 $32,843.07 <br />LS 1 $23,000.00 1.00 $23,000.00 <br />LS 1 $23,000.00 1.00 $23,000.00 <br />LS 1 $25,000.00 1.00 $25,000.00 <br />LS 1 $1,000.00 $0.00 <br />EA 7 $500.00 3 51,500.00 <br />LF 100 <br />$10.00 15 $150.00 <br />LS 1 $850.00 $0.00 <br />LF 60 $30.00 20 $600.00 <br />TN 100 $9.00 142.40 $1,281.1 0 <br />TN 75 $14.00 13.73 $192.22 <br />TN 15 $14.00 $0.00 <br />TN 30 $90.00 $0.00 <br />TN 30 $95.00 $0.00 <br />SY 200 $2.50 $0.00 <br />SY 300 $2.50 $0.00 <br />EA 12 $200.00 $0.00 <br />$107,566.89 <br />$90,525.00 <br />$107,566.89 <br />$198,091.89 <br />rtqu«tt4 <br />iJiMaemu
The URL can be used to link to this page
Your browser does not support the video tag.