My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2000 Council Packet
Orono
>
City Council
>
2000
>
08-14-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:28:31 AM
Creation date
3/15/2023 9:23:31 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'BONESYROO ROSENE ANDERLIK3 ^ 6516361311 <br />a <br />No.Itfin <br />Part 1 • Hwy 12 Relaif Lift Station <br />1 Highway 12 relief lift staion <br />2 Valve manhole, including meter <br />3 Flow control manhole, including weir plate <br />4 8 ” DIP sanitary sewer <br />5 8 ” PVC sanitary sewer <br />8 4" DIP forcemain <br />7 4” DIP bends <br />8 12 ” X 4" wet tap w/valve <br />9 Cut in 12* X 4* tee w/valve <br />10 SeedwAopsoil <br />11 Seed w/lopsoil <br />12 Class 5 aggregate base <br />Total Part 1 • Highway 12 Relief Lift Station: <br />Part 2 • West Femdale Lift Statione <br />13 Lift Station No. 2 rehabilitation incl. gravity manhole <br />14 Lift Station No. 3 rehabilitation <br />15 Lift Station No. 4 rehabilitation <br />16 Lift Station No. 5 rehabilitation <br />17 Gravity sewer MH <br />18 Connect to existing 2" PE FM <br />19 2"HOPErM <br />20 Core drill and install 2* FM into existing MH 432 <br />21 4” or 6* PVC service pipe <br />22 Granular borrow <br />23 Class 5 aggregate base <br />24 Class 5 aggregate base, 100% crushed ilmerock <br />25 Bituminous base <br />26 Bituminous wear <br />27 SeedwAopsoil <br />28 Sodw/topsoil <br />29 Furnish and install Evergreen Tree (blue spruce and <br />arborvitae) 6' high <br />Total Part 2 - West Femdale Lift Stations; <br />Total Part 1 • Highway 12 Relief Lift Station; <br />Total Part 2 • West Femdale Lift Stations: <br />Total Work Completed To Date <br />08/09/00 09:03 0 :03/0A N0:167 <br />$41,200.00 <br />$86,415.00 <br />$41,200.00 <br />$127,615.00 <br />••• <br />!;i <br />1:1 <br />I • <br />Contract Unit Quantity Amount <br />Unit Quantity Price to Date to Date <br />LS 1 $74,000.00 0.95 $70,300.00 'i <br />1 <br />LS 1 $8,200.00 0.90 $7,380.00 <br />i <br />as m <br />LS 1 $4,000.00 1.00 $4,000.00 <br />LS 1 $600.00 2.00 $1,200.00 <br />-» <br />9*4 <br />LF 10 $45.00 10.00 $450.00 <br />LF 55 $23.00 55.00 $1,265.00 i 1 <br />EA 4 $6|0.00 4.00 ' $320.00 t <br />i.f <br />LS 1 $1,500.00 1.00 $1,500.00 e <br />.LS 1 $2,200.00 $0.00 ih* <br />SY 100 $2.50 $0.00 <br />SY 200 $2.50 $0.00 <br />TN 30 $15.00 $0.00 .1 <br />$86,415.00 <br />sH <br />K! <br />LS 1 $121,641,00 0.11 $13,000.00 <br />i: <br />«6; <br />LS 1 $23,000.00 0.40 $9,300.00 •1 <br />1LS1$23,000.00 0.40 $9,300.00 <br />LS 1 $25,000.00 0.38 $9,600.00 <br />t i <br />LS 1 $1,000.00 $0.00 * 1 <br />•• <br />i; <br />EA 7 $500.00 $0.00 <br />.'j <br />LF 100 $10.00 $0.00 »• <br />LS 1 $850.00 $0.00 4 ^ <br />LF 60 $30.00 $0.00 ii <br />TN 100 $8.00 $0.00 j f <br />. i-TN 75 $14.00 $0.00 <br />TN 15 $14.00 $0.00 . i.i <br />> <br />(i <br />TN 30 $90.00 $0.00 <br />TN 30 <br />$96.00 $0.00 <br />SY 200 $2.50 $0.00 <br />SY 300 <br />$2.50 $0.00 u <br />•i <br />EA 12 $200.00 $0.00 !•! <br />.* <br />h <br />!•'ili* <br />}! <br />•Si <br />;ii <br />•ii <br />I <br />ii <br />!i! <br />♦.* <br />is.!:l <br />L-...-[■a&'iniBfrii 11' <br />h <br />is <br />f' <br />II. <br />........
The URL can be used to link to this page
Your browser does not support the video tag.