My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2000 Council Packet
Orono
>
City Council
>
2000
>
07-24-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:25:21 AM
Creation date
3/15/2023 9:23:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
kk <br />No.Item <br />Part 1 - Hwy 12 Relelf Lift Station <br />1 Highway 12 relief lift staion <br />2 Valve manhole, including meter <br />3 Flow control manhole, including weir plate <br />4 8" DIP sanitary sewer <br />5 8' PVC sanitary sewer <br />6 4” DIP forcemain <br />7 4" DIP bends <br />8 12"x4"wettapw/valve <br />9 Cut in 12* X 4* tee w/valve <br />10 Seedwftopsoil <br />11 Seed w/topsoil <br />12 Class 5 aggregate base <br />Total Part 1 • Highway 12 Relief Lift Station: <br />Part 2 - West Femdale Lift Stations <br />13 Lift Station No. 2 rehabilitation ind. gravity manhole <br />14 Lift Station No. 3 rehabilitotion <br />15 Lift Station No. 4 rehabilitation <br />16 Lift Station No. 5 rehabilitation <br />17 Gravity sewer MH <br />18 Connect to existing 2* PE FM <br />19 2"HDPEFM <br />20 Core drill and install 2* FM into existing MH 432 <br />21 4* or 6" PVC service pipe <br />22 Granular borrow <br />23 Class 5 aggregate base <br />24 Class 5 aggregate base, 100% crushed limerock <br />25 Bituminous base <br />26 Bituminous wear <br />27 Seed wftopsoil <br />28 Sod w/topsoil <br />29 Furnish and install Evergreen Tree (blue spruce and <br />arborvitae) 6* high <br />Total Part 2 • West Femdale Lift Stations <br />Total Part 1 • Highway 12 Relief Lift Station: <br />Total Part 2 - West Femdale Lift Stations: <br />Total Work Completed To Date <br />rtqusita <br />Contract Unit Quantity Amount <br />Unit Quantity Price to Date to Date <br />LS 1 $74,000.00 50%$37,000.00 <br />LS 1 $8,200.00 75%$6,150.00 <br />LS 1 $4,000.00 60%$2,400.00 <br />LS 1 $600.00 100%$600.00 <br />LF 10 <br />$45.00 $0.00 <br />LF 55 $23.00 43 $969.00 <br />EA 4 $80.00 $0.00 <br />LS 1 $1,500.00 100%$1,500.00 <br />LS 1 $2,200.00 $0.00 <br />SY 100 $2.50 $0.00 <br />SY 200 $2.50 $0.00 <br />TN 30 $15.00 $0.00 <br />$48,639.00 <br />LS 1 $121,641.00 10%$12,164.10 <br />LS 1 $23,000.00 10%$2,300.00 <br />LS 1 $23,000.00 10%$2,300.00 <br />LS 1 $25,000.00 10%$2,500.00 <br />LS 1 $1,000.00 $0.00 <br />EA 7 $500.00 $0.00 <br />LF 100 $10.00 $0.00 <br />LS 1 $850.00 $0.00 <br />LF 60 $30.00 $0.00 <br />TN 100 $9.00 $0.00 <br />TN 75 $14.00 $0.00 <br />TN 15 $14.00 $0.00 <br />TN 30 $90.00 $0.00 <br />TN 30 $95.00 $0.00 <br />SY 200 $2.50 $0.00 <br />SY 300 $2.50 $0.00 <br />EA 12 $200.00 $0.00 <br />$19,264.10 <br />$48,639.00 <br />$19,264.10 <br />$67,903.10 <br />L...
The URL can be used to link to this page
Your browser does not support the video tag.