My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2000 Council Packet
Orono
>
City Council
>
2000
>
06-12-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:19:56 AM
Creation date
3/15/2023 9:12:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item <br />Chanae Order Number 1 <br />i , . <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />20 <br />21 <br />22 <br />Part 1 • Sanitary Sewer <br />8 ’ PVC sanitary sewer, SDR 35. 0'-8’ deep <br />Connect 8" PVC to existing manhole <br />4' diameter sanitary MH, 8' deep, incl R*1642*B <br />cstg <br />Directional bore 8" HDPE SDR 11 <br />Directional bore 4" HDPE SDR 11 service pipe <br />4" PVC cleanout <br />8" X 4" PVC service wye branch <br />Furnish 8" x 4" PVC wye, cut into ex. 8‘ <br />4" PVC service pipe in place, SDR 26 <br />Mechanical trench compaction <br />Insulation <br />Sanitary sewer television inspection <br />Connect 4" PVC to existing home <br />Total Part 1 - Sanitary Sewer <br />PVC <br />Part 2 • Restoration <br />Clear and Grub <br />Sod with 4" topscil <br />Seed with topsoil, mulch and fertilizer <br />Erosion control fence <br />Furnish and plant Evergreen Tree (Blue Spruce) <br />6' high <br />Furnish and plant shade tree (Sugar Maple) 4" <br />diameter <br />Remove and transplant bushes <br />Remove and transplant tree • Deciduous <br />Remove and transplant tree • Coniferous <br />Total Part 2 • Restoration <br />Change Order No. 1 <br />Total Part 1 • Sanitary Sewer <br />Total Part 2 - Restoration <br />Total Work Completed To Date <br />Contract Unit Quantity Amount <br />Jnit Quantihy Price to Date to Date <br />LF 1030 322 1073 S34.550.60 <br />EA 1 2436 8 1 S2.436 60 <br />EA 7 1779.7 7 $12,457.90 <br />LF 60 74.8 60 $4,488.00 <br />LF 585 48.3 780 $37,674.00 <br />EA 7 281.1 10 $2,811.00 <br />EA 6 40.5 6 $24300 <br />EA 3 1703.3 3 $5,109 90 <br />LF 550 19 458 $8,702.00 <br />LF • 1580 093 1531 $1,500.38 <br />SY 100 9.6 64 $614.40 <br />LF 1030 16 1140 $1,824.00 <br />EA 8 2545.3 10 $25.45300 <br />$137,924.98 <br />LS 1 3786 1.26 $4,770.36 <br />SY 2000 36 750 $2,700.90 <br />AC 1 5244 5 1.3 SG.817.05 <br />LF 1050 1.8 585 $1,053.00 <br />EA 20 345 9 $000 <br />EA 10 345.9 $0.00 <br />EA 10 232.3 1 $232.30 <br />EA 10 232.3 $0.00 <br />EA 10 232.3 $0.00 <br />$15,573.51 <br />$137,924.98 <br />$15,573.51 <br />$153,498.49
The URL can be used to link to this page
Your browser does not support the video tag.