My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2000 Council Packet
Orono
>
City Council
>
2000
>
06-12-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:19:56 AM
Creation date
3/15/2023 9:12:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />The public road would be platted with a 60-foot wide Right of Way and cul-de-sac at the Rudd’s <br />east property line. Sixty feet is a standard Right of Way width in Medina, so it makes sense to <br />continue this width to the end of the road. The proposed concept is for two driveways off of the <br />cul-de-sac. One driveway will serve the Fraizer property. The other driveway would be a shared <br />driveway to serve the Slaughter and Hickey properties. Our understanding is the Slaughter’s ar.i <br />Hickey’s have an access easement for a driveway across the Fraizer property. A copy of these <br />easement documents should be provided to the City for our review to verify that there is a legal <br />access for all of the properties. The road in Orono should be built to the same standards as the <br />road in Medina. Varying the road standards for the small segment of road in Orono is not <br />practical. <br />Project Schedule <br />This project will require plat approval in both Orono and Medina. Medina’s schedule is to have <br />the plat approval process completed by July 1”, so the process for securing funding from <br />MNDOT can be started. Our understanding is that the proposed schedule for the road construction <br />with MNDOT funding is scheduled for 2003 at the same time the new traffic signal is installed <br />at the Highway 12/ County Road 29 intersection. We are recommending that this road be <br />constructed as soon as possible to eliminate the hazardous driveway on Highway 12.The proposed <br />schedule is for the Council to review and provide comments on this concept plan at this meeting. <br />Rudd’s will then submit an application for preliminary plat approval for the May Orono Planning <br />Commission meeting on May 15^**. Preliminary and final plat approval could then be completed <br />by the Council in May and June to meet the July 1“ deadline. <br />COUNCIL ACTION REQUESTED: <br />Review and discuss proposed concept plan for a new access road east of Townline Road
The URL can be used to link to this page
Your browser does not support the video tag.