My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2000 Council Packet
Orono
>
City Council
>
2000
>
06-12-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 9:19:56 AM
Creation date
3/15/2023 9:12:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I' <br />If w <br />TO:Paul Weinberger, Zoning Administrator/Planner <br />FROM:Chris Pence, On-Site Systems Manager <br />DATE:May 26, 2000 <br />SUBJECT: Septic Review for Application #2585, Tom McCaffrey and Fred Shemanek, Lot Line <br />Rearrangement, Chippewa Lane. <br />The two properties in the proposed lot line rearrangement require the use of on-site sewage treatment <br />systems. Soil borings and percolation tests were performed by S-P Testing, Inc. on April 13, 2000 <br />to identify primary and alternate drainfield sites on each lot. <br />The septic system at 4355 Chippewa Lane has been classified as non-compliant. A design has been <br />submitted that meets all current State and City codes. The existing septic system will need to be <br />replaced by December 31, 2010. If the septic system is found failing before that time, the septic <br />must be replaced within 90 days. <br />The septic system at 4265 Chippewa Lane has been classified as non-compliant. A design has been <br />submitted that meets all current State and City codes. The existing septic system will need to be <br />replaced by December 31, 2010. If the septic system is found failing before that time, the septic <br />must be replaced within 90 days. <br />Based on the above information, staff recommends approval of the lot line rearrangement. The City <br />requires the drainfield sites be fenced off prior to any grading or land alt.^ration on these lots <br />D
The URL can be used to link to this page
Your browser does not support the video tag.