Laserfiche WebLink
i s <br />05/15/00 14:20 0 :03/04 N0:204 <br />No. Item <br />Part 1 • Hwy 12 Ratalf Lift Station <br />1 Highway 12 relief lift staion <br />2 Valve manhole, including meter <br />3 Plow control manhole, including weir plate <br />4 8* DIP sanitary sewer <br />5 8" PVC sanitary sewer <br />8 4* DIP torcemain <br />7 4” DIP bends <br />8 12" X 4" wet tap w/valve <br />9 Cut In 12" X 4" tee w/valve <br />10 Seed w/topsoll <br />11 Seed w/topsoil <br />rtqvitfi \ <br />Total Part 1 • Highway 12 Relief Lift Station:$8,620.00 <br />Part 2 • West Ferndale Lift Stations <br />13 Lift Station No. 2 rehabilitation Incl. gravity manhole LS 1 $121,641.00 10%$12,164.10 <br />14 Lilt Station No. 3 rehabilitation LS 1 $23,000.00 10%$2,300.00 <br />15 LIP Station No. 4 rehabilitation LS 1 $23,000.00 10%$2,300.00 <br />16 Lift Station No. 5 rehabilitation LS 1 $25,000.00 10%$2,500.00 <br />17 Gravity sowar MH LS 1 $1,000.00 $0.00 <br />18 Connect to existing 2" PE FM EA 7 $500.00 $0.00 <br />19 2"HDPEFM LF 100 $10.00 $0.00 <br />20 Core drill and install 2* FM into existing MH 432 LS 1 $850.00 $0.00 <br />21 4* or 6" PVC service pipe LF 60 $30.00 $0.00 <br />22 Granular borrow TN 100 $9.00 $0.00 <br />23 Class 5 aggregate base TN 75 $14.00 $0.00 <br />24 Class 5 aggregate base. 100% crushed llmerock TN 15 $14.00 $0.00 <br />2S Bituminous base TN 30 <br />$90.00 $0.00 <br />20 Bituminous wear TN 30 $95.00 $0.00 <br />27 Seed w/topsoil SY 200 $2.50 $0.00 <br />28 SodwAopsoll SY 300 $2.50 $0.00 <br />29 Furnish and Install Evergreen Tree (blue spruce and <br />arborvitae) 6' high <br />Total Part 2 • West Ferndale Lift Stations: <br />Total Part 1 • Highway 12 Relief Lift Station: <br />Total Part 2 • West Ferndale Lift Stations: <br />Total Work Completed To Data <br />EA 12 $200.00 $0.00 <br />$19,264.10 <br />$8,620.00 <br />$19,264.10 <br />$27,884.10 <br />ir. <br />Contract UnH Quantity Amount !» <br />I* <br />Unit Quantity Price to Data to Data <br />LS 1 $7-. 000.00 10%$7,400.00 <br />•« <br />»• <br />LS 1 $6,200.00 10%$820.00 1- <br />LS 1 $4,000.00 10%$400.00 <br />LS 1 $600.00 $0 00 a <br />. i. <br />LF 10 $45.00 $0.00 •t <br />f <br />‘F 55 $23.00 $0.00 • •. <br />t.‘»*! <br />EA 4 $80.00 $0.00 • 1 <br />t <br />t' <br />LS 1 $1,500.00 $0.00 •i <br />V <br />LS 1 $2,200.00 $0.00 . V <br />. *.• <br />SY 100 $2.50 $0.00 X <br />I’* <br />SY 200 $2.50 $0.00 l«. <br />TN 30 $15.00 $0.00 <br />I'! <br />I’l <br />Ii« <br />• I* <br />»• <br />t* <br />*11 <br />• f <br />•? <br />?; <br />••e <br />•‘Iiii <br />I <br />•ft* <br />I': <br />ii <br />1*9 <br />lit <br />•t* <br />?» <br />MI <br />I <br />ii. <br />I