My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2000 Council Packet
Orono
>
City Council
>
2000
>
04-10-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2023 8:53:42 AM
Creation date
3/15/2023 8:44:52 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
425
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■ V- t#*' ■'Hi*'•: ?r ^ • .f/• ^ .V •- <br />Because of these engineering issues, staff is not prepared to reeommend approval at this time. Note <br />that applicants have made a concerted effort to make this site plan work by locating a portion of the <br />parking underground. The number of parking stalls required for this size building is a key factor <br />impacting the site layout, along with the topography challenges and the required storm pond. <br />It would be helpful to the applicants if Council would address as many of the following issues as <br />possible: <br />1.Confirm acceptance of zoning amendment to allow “drug store” use in the B-5 zone; <br />as a permitted use? As a conditional use? Any specified conditions if it’s a <br />conditional use? <br />Confirmation that Council will vacate all noted portions ofNavarre Lane, and rezone <br />the appropriate portions to B-5. <br />3. <br />4. <br />Confirm acceptance or non-acceptance of hardcover variances. <br />Confirm acceptance or non-acceptance of 5’ variance to allow 15' front setback for <br />parking. <br />5. <br />6. <br />Confirm acceptance or non-acceptance of CUP for grading within 5' of lot lines. <br />Discuss landscape plan and define any areas where additional plantings or screening <br />of retaining walls may be necessary. <br />7.Confirm acceptance or non-acceptance of trail connection proposal in light of Park <br />Commission suggestions. <br />8. Other topics Council wishes to discuss. <br />Options for Council Action <br />1. Table for additional information or revisions (60-day e.xtcnsion required) <br />2. Approve with conditions (direct staff to draft appropriate resolution) <br />j.Denv (state reasons) <br />4.Other action. <br />»2567 ii’alfreJ Properties <br />2380 Shadp^ooJ Road <br />Commercial Site Plan Revicn <br />April 10. 2000 <br />page-9
The URL can be used to link to this page
Your browser does not support the video tag.