My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-13-2023 Council Packet
Orono
>
City Council
>
2023
>
03-13-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 1:58:21 PM
Creation date
3/14/2023 10:00:41 AM
Metadata
Text box
ID:
1
Creator:
Created:
3/14/2023 10:01 AM
Modified:
3/14/2023 10:01 AM
Text:
Carol Price comment
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Date: 21 February 2023 <br /> <br />Subject: #LA22-000068, Valdes Lawn Care and Snow Removal LLC o/b/o Mark and Lisa <br />Thostenson 2815 Casco Point Road After-the-fact Setback Variances Public Hearing <br /> <br />Other Previous Documents <br /> Certificate of Survey for Lisa Thostenson, dated 5/18/2022 <br /> RPS22-0000126 Permit Plan Packet, PC Exhibit J: Hardcover Calculation Worksheet, dated <br />8/15/2022 <br /> <br /> <br />Hello Melanie, <br />After reviewing the packet of information regarding agenda item #LA22-000068, please note <br />some significant items that caught my attention and may solicit further scrutiny by the Planning <br />Commission Members and the City Council Members. <br /> <br /> <br />Background (page 1) <br />This statement highlighted in red below is in error. "Because the work was halted prior to <br />completion, on November 28th the owner requested and received permission from the City <br />Council to install a final wall at the top of the slope which their engineer determined to be <br />necessary to protect the integrity of the slope. Their engineer provided documentation showing <br />the slope failure is imminent and needed an emergency correction. That final wall has been <br />installed." <br /> The final wall has not been installed. As a result, the integrity of the slope is not protected. <br /> The "As-Built" drawings, Certificate of Survey - Wall Detail Original Design, dated 2/3/2013 <br />by E.G. Rud & Sons, Inc. show six timber walls have been built to date. The original <br />engineering drawing prepared by Criterium-Schimnowski Engineers, dated 8/24/2022 depicts <br />seven timber retaining walls that were supposed to be built on the bluff. Hence, when the <br />Stop Work order was issued on October 28, 2022, the final timber wall had not been built <br />and the owner requested the emergency permission to build the final 7th timber retaining <br />wall. <br /> When the Stop Work order was issued, the crew from Valdes Lawn Care and Snow Removal <br />did as much as they could to protect the bluff and stage the needed materials to build the last <br />remaining timber wall. The exposed dirt at the top of the bluff was covered in erosion <br />burlap; the timbers for the final wall build were staged at the top of the bluff and remain <br />untouched to this day. The crew also left a large pile of dirt near the bluff with the assumed <br />intent to use it to backfill for the final timber wall with dirt and stones. <br /> The photos included in the letter from Schimnowski Criterium Engineers dated November <br />18, 2022 (regarding the "Timber Retaining Wall Upper Tier") most closely resemble the <br />current condition of the bluff with the exception of snow on the ground. The outline for the <br />placement of the 7th timber wall was shown the photos to depict the location of the final wall <br />build. However, no timber wall was built in this location, and thus this final retaining wall <br />was not included in the As-Built drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.