Laserfiche WebLink
Prepared By: Reviewed By:A. Carlson Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to close out the 2021 Street Maintenance Project (21- <br />001), the Casco Point Stormwater Project (21-026), and the Fagerness Point Stormwater Project (21-028) <br />as well as approve the final pay application. <br /> <br />2. Background. On November 23rd, 2020 Council approved the design and engineering of the Casco <br />Point Stormwater project, Fagerness Point Stormwater project. Due to their common nature, these <br />projects were combined with the streets project into one bid package in an effort get the best possible bids <br />for the project. On March 8th, 2021 the project was awarded to Omann Brothers. The Project is now <br />complete and all project close out document have been received. <br /> <br />3. Scope of Work. <br /> <br />a. 2021 Street Maintenance Project (21-001): The project consisted of the reclamation and/or mill <br />and overlay of the bituminous pavement, select subgrade corrections, and the replacement / improvement <br />of the associated stormwater systems for Casco Circle, Eileen Street, Park Lane, Elm Street, East Navarre <br />Roads (Kenwood, Olive, Lafayette Ridge, Bayview, Navarre Ln,) and the West Navarre Roads (Crystal <br />Place, Lyric, Blaine). <br /> <br />b. Fagerness Point Stormwater Project (21-028): The project consisted of curbing, pavement <br />adjustments and a storm pipe on a select portion of the roadway. <br /> <br />c. Casco Point Stormwater Project (21-026): The project consisted of curbing, pavement <br />adjustments and replacement of a stormwater structure. It also includes a tie into the Casco Circle project <br />with a new storm pipe. <br /> <br />4. Cost. The total construction cost of for the project is $1,460,129.67. The final pay application from <br />Omann Brothers is for $28,605.00. The original construction bid was for $1,389,655.99. Additional <br />authorized work was $70,473.68. The additional work included installation of water gate valves in the <br />project area and additional curb and gutter. <br /> <br />5. Funding. Funding for the project comes from a combination of the pavement management fund, <br />stormwater fund, water fund, sewer fund and community investment fund. <br /> <br />6. Staff Recommendation. I recommend payment of the final pay application to Omann Brothers in <br />the amount of $ 28,605.00. <br /> <br />COUNCIL ACTION REQUESTED <br />Move to approve payment of final pay request to Omann Brothers in the amount $ 28,605.00 and to close <br />out the project. <br /> <br />Reference <br />A. Final Pay Request. <br />Item No.: 11 Date: February 13, 2023 <br />Item Description: 2021 Road Maintenance Project – Final Payment and Project <br />Closeout <br />Presenter: Adam Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Consent Agenda