My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-2000 Council Packet
Orono
>
City Council
>
2000
>
03-27-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:30:21 PM
Creation date
3/9/2023 4:26:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />Page 1 of 2 <br />CITY of ORONO <br />Municipal Offices <br />Street Address: <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />Mailing Address: <br />P.O. Box 66 <br />Crystal Bay, MN 55323-0066 <br />Bradley A. Hoyt <br />2523 Kelly Avenue <br />Excelsior, MN 55331 <br />Re: Application #2540 <br />Dear Mj. Hoyt: <br />The Planning Commission review on November 15 resulted in a recommendation for denial of your <br />CUP request, based partially on a lack of sufficient information to support a variance approval. We <br />believe that the following information is critical to a variance review for your project, and should <br />be submitted if you wish to proceed with amending your request to include the necessary variances: <br />1. <br />2. <br />J. <br />4. <br />5. <br />6. <br />Completed variance application form, including statement of hardship/unusual property <br />conditions, etc. <br />Name/address of any landscape designer who may have been involved in designing the <br />improvements. Name/address of contractor who completed the work. <br />The plans given to the contractor defining what work was intended, such as existing and <br />proposed contours; retaining wall specifications; engineering calculations on any segments <br />of wall in excess of 48" in height; any pre-construction surveys you may have available; cut <br />and fill calculations indicating the volume, in cubic yards, of material proposed to be moved <br />on the property, etc. <br />Any as-built specifications provided by the contractor, especially if the final result was <br />different than the proposed plan. We do have your post-construction survey on file as <br />submitted. <br />Any photographs or other documentation of the condition of the shoreline prior to <br />construction of the walls, especially any tree damage, or any documentation from any tree <br />service which may have removed storm-damaged trees. <br />Any additional information which you believe will enhance the City’s understanding of what <br />w ork was completed and the reasons it was undertaken. <br />Telephone (612) 249-4600 • Fax (612) 249-4616 <br />Page 7 of 11
The URL can be used to link to this page
Your browser does not support the video tag.