My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-24-2000 Council Packet
Orono
>
City Council
>
2000
>
01-24-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:21:12 PM
Creation date
3/9/2023 4:18:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Easements <br />The applicant would be required to dedicate drainage and utiliiy easements 10’ along the boundaries <br />of the property and road outlot, and 5' along all internal property lines. A wetland appears on <br />proposed lot 1. The applicant shall covenant for Type II and VI wetlands within Lot 1. <br />Proposed Highway 12 Development <br />MnDot will be rerouting Highway 12 along the rail corridor located adjacent to the North side of the <br />property. The plans include MnDot purchasing the entire property proposed for subdivision. The <br />plan for the site, once acquired by the State, would be to develop it as a ponding area. The state <br />would be purchasing all three lots located in the Spruce Acres Subdivision. A map illustrating the <br />proposed ponding plan is included with this Report as "Exhibit M". <br />Staff Recommendation <br />Table the Preliminary Plat to provide applicant with an opportunity to redesign the subdivision to <br />meet zoning standards, and to address concerns for access to the property. <br />Other items that will need to be addressed prior to Final Plat approval: <br />1. <br />2. <br />Applicant to dedicate drainage and utility easements 10’ along the boundaries of the property <br />and road outlot, and 5’ along all internal lot lines. <br />Applicant to develop covenant for Type II and VI wetlands located within Lot 1. The <br />purpose of the covenant is to alert all future property owners of the need to protect the area <br />if alterations are proposed to first obtain the necessary approvals from the Corps of Engineers <br />and Minnehaha Creek Watershed District before applying for approvals from the City of <br />Orono. <br />3. <br />4. <br />5. <br />6. <br />Park dedication fee for Lot 1 would be collected by the City. <br />Complete a road maintenance agreement with neighboring property owners, and develop the <br />new street as a private drive with a cul-de-sac. <br />Grant road and utility easements over the road outlot. <br />Maintenance covenants shall be provided for road and drainage improvements. <br />H2450 GUnnGronberg <br />325 North Willow Drive <br />preliminary Subdivision <br />1/19/99 <br />Page 5
The URL can be used to link to this page
Your browser does not support the video tag.