My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-24-2000 Council Packet
Orono
>
City Council
>
1950-2024
>
2000-2009
>
2000
>
01-24-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:21:12 PM
Creation date
3/9/2023 4:18:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO CITY COUNCIL MEETING <br />MINUTES FOR JANUARY 10,2000 <br />(#4) #2522 BANCOR GROUP, INC - Continued <br />monuments will be part of the landscape plan. He can make the monuments small with a lower <br />profile. <br />Kelley said Greg Gappa should review the plan for traffic flow. <br />Flint said he does not have strong feelings about the median. <br />Newman said that as they are working with the landscape design, they might want to shift some <br />of the lot lines to make a more direct trail system. He asked if the Council would object to this. <br />There was no objection from the Council members. <br />Flint said that paragraphs 8 and 10 talk about the timing of the construction of the private road. <br />The Council had discussed the importance of the trail being built early in the project. He asked if <br />paragraphs 8 and 10 should address the construction of the trail. <br />Moorse said he thought there was a paragraph that indicates that the trails will be constructed <br />before any homes are built. If not, it should be included now. <br />Weinberger said it could be included in the Developer's Agreement. <br />Flint asked about the width of the trail easement. He said that paragraph 16 states a 12’ trail <br />easement shall be granted in favor of the City of Orono between Lots 7 and 8, but it doesn ’t talk <br />about the width of the rest of the trau. <br />Kelley said the rest of the trail goes right into the outlot. <br />Weinberger said the trail easement would be taken over the entire outlot and the trails be <br />developed as shown on the preliminary plan. He said the actual trail width would be 8 feet. <br />Flint said paragraph 19 states "Subdivider shall plant boulevard trees along the private road per <br />the requirements of Section 11.60, Subd. 2." He asked if the boulevard trees along 6 and along <br />Willow would be part of the landscape plan. <br />Weinberger said that is correct and that the landscape plan that was pro% ided had shown trees <br />along the backs of the lots to buffer between Willow Drive, County Road 6 and the individual <br />lots. They are required to plant a 2-inch diameter tree every 40 feet on the boulevard after the <br />road is completed. <br />Flint asked if the landscape plan is adequate for that. <br />Page?
The URL can be used to link to this page
Your browser does not support the video tag.