Laserfiche WebLink
00 MOW 17 j 3S Fa.1 !«]U <br />'v'!r ;*.V T. <br />•v'- <br />PRELIMINARY COST ESTIMATE <br />WILLOW DRIVE PROPERTY <br />ORONO, MlN>*ESOTA <br />THE BANCOR GROUP <br />PROJECT NO. 91>286 <br />.lanuAiy 3,1000 <br />(25 I.OM) <br />»‘^f***' • . f.V.iums-.v <br />Piierariffi 'CTKNjir'r.-t'. <br />l.^PWCBi <br />6” WatennainDuct Iron Cl. 52 (hydrant <br />leads) <br />L.F.220 17.00 3,740.00 1 <br />ft” \V?itcrmain Duct Iron Cl. 52 includes stuhS- <br />to north & south') <br />L.r.4900 10.00 93,100.00 1 <br />8" Gate Valve and Box Each 5 650.00 3.250.00 I <br />fire Hydiant W/6" Gate Valve and Box ____Each 1900.00 iSpoo.oa 1 <br />r Corporation Stop Each 25 33.00 875,00 1 <br />1'' Curb Stop and Box 25 75.00 1,875.00 <br />1" Tvpe K Copper Pipe L.F.800 8.00 6.400.00 <br />Oranular Beddinst Ton 700 4.00 2.800.00 <br />1 8" X 8” Wet Tap (complete, including gate <br />valve) ______ <br />Each <br />1 ■ *: *i <br />1 <br />km& <br />1500.00 1,500.00 <br />’ S 136J40.0» <br />CTt.CC R.crn»AKK6NnAT\0U — <br />cnv rt.v5 rot. EXT(M5toMs i <br />WOWKC SOUTh <br />9" LIME SC^OftLlO f.L 9 <br />^ J <br />9i <br />•/l <br />»/i cnv <br />.t?cdC'C'Nr-s 9ib3:ci3I3 li‘‘Ll ooo:/£