My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-2000 Council Packet
Orono
>
City Council
>
2000
>
01-10-2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 4:20:42 PM
Creation date
3/9/2023 4:18:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t • <br />The Bancor Group* Inc.04 <br />Bancoi <br />Januavy 5, 2000 <br />Mr. Ron Morris <br />City Administrator <br />City ofOvono <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />Re: Willow View Estates. <br />Dear Mr. Morris: <br />.A.t the last City Council meeting when the Council granted pi*eliminaiy plat approval for the <br />above community, there was discussion surrounding the requirement that we extend city <br />water to the site. It was my general impression from the discussions that while we objected to <br />this requirement and the Council acknowledged that tliis was not their general polic>', the <br />Council did believe that there was a public safet>' benefit in making this requirement. I <br />suggested at that time that I did not believe it was fair that we bo roqxiirod to be eolelj' <br />responsible for the cost of: (i) bringing water to the site and (ii) over sizing the system so that it <br />can service other properties. In response city staff indicated that they thought a location to <br />connect to the water system could be located witliin fifty feet of our propert5^ Further, the <br />Council suggested that prior to approving the formal written resolution next Monday night, I <br />was ftee to provide a more formal cost estimate and that they would consider some assistance <br />for tho.se over sizing costs th.sf. are required to benefit other properties. <br />Since that Council meeting I have had our engineer prepare specific cost estimates for <br />installing water at this site. I would like to briefly summarize those costa. As part of hia work <br />you will note he has determined that the nearest source of water is in fact aypro.ximately 800 <br />feet from our western propertj* hne. <br />Area A.s$essments (2o lots x So,510) $145,250 <br />Cost of extending watex* 800 feet from school to west property line $15,200 <br />Cost of full water system with 8 inch lines as propo.sed by city engineer S115.440 <br />(Please note that 1 have chaixged tho estimate to reflect S hydr.ants rather than 11) <br />TOTAL $275,890 <br />Unw M.F.. <br />ZQ S15336icX9 0^:^! 0003/so/'
The URL can be used to link to this page
Your browser does not support the video tag.