Laserfiche WebLink
S -P TESTING, INC. Steven B. Schirmers — MPCA Ceit. No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497.3566 <br />April 16, 1995 <br />Bryson & Myers <br />Cluster System <br />Big Island <br />Orono, Henn. Co., MN <br />This On -Site Sewage Treatment System is Designed for a Type 1, two <br />bedroom home for each site = 600 gal/day. Each site is an actual <br />Type 11, two bedroom. Designed in accordance with the Minnesota <br />Pollution Control Agency Chapter 7080 and loyal ordinances. <br />This system is designed as a cluster system due to very limited <br />space for adequately treating septic effluent. The proposed <br />system is a 10"dia. graveless trench located at cabin A, the <br />Bryson property. Recommend an easment & maintenance agreement <br />be made between the 2 land owners & the City of Orono. <br />The soils on this site are a clay loam. A seasonally saturated <br />layer of soil was found at 66" to 78", (mottled soil). The bottom <br />of the system must be located at least 3' above the seasonally <br />saturated soil. <br />The soils at a depth of 30" have a percolation rate averaging <br />15.6 min/inch. <br />A pumping chamber will need to be installed to lift the effluent <br />to the treatment area. <br />The power supply and switches must be located outside the manhole <br />and pumping chamber in a weather proof enclosure. A warning device <br />must be installed with a light and sound device, this is in case of <br />a pump failure. <br />Due to the system being seasonally used, the ta..ks must be insulated <br />to prevent freezing during winter months. The accumulation of <br />sludge should be inspected no less frequent than every three years. <br />The disposal of sludge should take place whenever the top of the <br />sludge layer is less than 17." below the bittom of the outlet baffle <br />cit, why nr•:ar bottom of tho scum layer is less than 1" above the <br />bottom of the outlet baffle. Removal of septage shall include <br />complete removal of scum and sludge. <br />A water meter must be installed at each cabin to monitor the daily <br />water use. <br />Due to this site being the only area available for an On -Site Sewage <br />Treatment System, recommend to install low water use facilities, <br />1.6gal/flush toilets, low flow shower heads etc. <br />