Laserfiche WebLink
-0 O <br />January 6, 1994 <br />Mr. Robert Olson <br />4645 Bayside Road <br />Maple Plain, Minnesota 55359 <br />Dear Mr. Olson: <br />CITY of ORONO <br />NTunkipal OMm— <br />Street Address: Mailing Address: <br />2750 Kelley Parkway P 0 Box 66 <br />Orono, MN 55356 Crystal Bay. MN 553230066 <br />Due to the extremely wet year, we realize that the required repair of your septic system may <br />have been difficult to complete last summer. This is a reminder that the septic system repair <br />will be required next year. <br />A licensed septic contractor must get a permit from the City of Orono by July 15, 1994 for the <br />repair of your septic system. The procedure for completing septic system repairs is shown <br />below. Please contact me at the City offices if there are any questions. <br />PROCEDURE. FOR SEPTIC SYSTEM REPAIR <br />1. Hire a Site Evaluator/System Designer to do the soil testing and system design. <br />2. Submit the design to the City for approval. <br />3. Once the design is approved, have one or more contractors bid on the approved design. <br />4. The contractor you choose should then obtain a permit from the City before starting work. <br />He will call the City for the required inspections. <br />Sincerely. <br />Stephen WLCkman <br />On -Site Systems Manager <br />SW/ch <br />Enc. Septic Report <br />List of Septic ('ontractors and Site Evaluators/ Designers <br />Telephone 1612) 473-7357 • FAX 473-0510 <br />