Laserfiche WebLink
�'��kE9Ha4�G <br />September 9, 1991 <br />Bonita wells <br />4485 Bayside Road <br />Maple Plain, MN 55359 <br />RE: Septic System Repairs <br />Dear Ms. Wells: <br />CITY of ORONO <br />.tom of" <br />Pint Olht On d< <br />Cnaw Rn, SEMWSOU 533114.OM <br />This is a reminder that a recent inspection revealed that your <br />septic system is failing and must be repaired. <br />Please contact me within 30 days to discuss your options. You <br />have 90 days in which to make repairs to the system. Enclosed is <br />a copy of your most recent septic report. <br />The prccedure for initiating septic system repairs is as follows: <br />1. Hire a Soil/Site Evaluator to do the necessary testing <br />and design. <br />2. Submit the design to the City for approval. <br />3. Once the design is approved, have one or more <br />contractors bid on the approved design. <br />4. The contractor you choose should then obtain a permit <br />from the City before startino work, and he will call <br />for the required inspections. <br />If you have any questions please contact me at the City offices. <br />Thank you for your prompt attention to this letter. <br />Sincercly, <br />Stephen Weckman <br />Septic System Inspector <br />Enclosure <br />SW/lsv <br />I-FLEPHONE - 473.7357 . FAA • m4K10 <br />