Laserfiche WebLink
TY OF ORONO Permit t <br />�.I SYSTEM APPROVAL Fee $ <br />F ti ;'.-, .• Entered By of this this report and is <br />The General Contractor will be given a copy <br />DESIGN IS for its <br />distribution <br />AS APPROVED UNLESSnTHIS SHEETtISsATTASCHLDC SYSTEM <br />LOCATION: <br />PflONS: <br />GENERAL CONTRACTOR: <br />P—___._______ <br />SEPTIC CONTRACTOR: HONE: <br />PHONE:i_. <br />OWNER: T 1i ��� -- <br />APPROVED (Note Changes Below) <br />CONDITIONALLY APPROVED: <br />COMMENTS: <br />st <br />NOTICE <br />pproC aTO l ofl�theAinsp inspector (477 7357)$ to Call forpinsp ctiroved ons 24 hours lans and pinsadvance have prior <br />NOTICE TO GENERAL CONTRACTORS■ Primary and alternate drainfield sites MOST be protected <br />prior to and fter system installa:_on to avoid compaction of the natural1- <br />a <br />ion <br />ALL DRAINFIELD AREAS MOST BE PENCED Of? prior building <br />pourtfootingstwill and <br />notfencing <br />be granted <br />remain in place until final aite grading. Approval <br />until the Inspections Department has verified that primary and alternate sites ars <br />adequately protected. <br />so VEHICULAR TRAIlIC OF ANY MIND (cars, trucks, earth moving equipment, etc.) is allowed <br />within 20' of tested drainfield sites either before or after system construction. This <br />applies to the lot you are working on and all adjacent lots. You could be held liable for <br />damaging sites on neighboring lots. <br />VEHICDLAR TNATlIC CAN CAUSE SOIL COMPACTION, KORRlNGfor D^RAX"IatiOn °LbuiSIT" 4 Npermits. <br />BX <br />Evidence of traffic on drainfield sites may <br />Damaged alternate sites must be replaced before a Certificate of occupancy will be issued. <br />Date —Approved S �� Bylty o Orono <br />