Laserfiche WebLink
CITY OT ORONO <br />(CIkI. <br />Munlclpel Offices <br />►ostOffice Box 66 <br />Crystl Say, NN S5323-0066 ITEWU ON -$INSPECTION REPOSEWAGE RT <br />Owner:�S tJ/9�I� Address <br />Permit *'a: A 47 Dates: Contractors: <br />City ordinance number 100 requires that each on-site serape treatment systest in Orono be fuspectedon a regular basis. <br />The on-site serape treatment system at the above address has been Inspected and appears to fell into the catepoty <br />checked below. <br />(This Is )4 an existing system ( ) now construction) <br />"CCOE SYSTEM" -A system which onto all the location, design, and construction standards of the current City <br />Codes, and MIM is operating sat lsfactori y by treating ab disposing of the entire current swaps Input <br />without discharging any pollutants into grovel or surface maters. <br />"CONFOftING SYSTEM -A system which does not meet ell the location, design, and construction standards of the <br />current City Code but was installed according t) the code In effect at the time of installation, and which <br />is operating satislactorlly by treating and disposing of the entire current swage input without discharging <br />" pollutants into gravel or surface waters. <br />"NON-COIEORMING SYSTEM --A prohibited system; a system located within a designated 100 -year floodplain; any <br />system which way or may not reet _hl see location, design, and construction standards of the current City <br />Codes and whichis fiillrq /e: awry reason; and any system with less than 3 feet of unsaturated soil or sand <br />between the di ,it ributlon dev'ce and the Its ting toil characteristics. <br />(The limiting toil characteristic ( ) has or 16 has not been Identified at this time. If the limiting soil <br />characteristic has not been identified, this Elissfficatim may be shbjKt to revision.) <br />TANK CONDITION (5-10): <br />Inspection indicates: <br />C.6 ►utPout not needed a[ this time. <br />6 Solids accumulation m tanks Itdhcates they should be out this year to help prevent future problem. <br />) Solids accumulation in tanks is t a critical level. To*% should be putped out as soon as possible. <br />a System is discharging to the surface. Tanks not be pumped out within 68 hours to eliminate surface discharge. <br />9 Inspection Heart missing -tanks could not be inspected. Inspection risers (6" die, pipe) must be installed in each <br />tank At next pumpout. If tanks have not been pumped out within the last three years, they shoult: be pumped <br />Out now. <br />10 inspection pip! Vs .«tied directly over tank baffle (does not give accurate measurement of solids KCWlation). <br />If tanks have not been pwped out within the Int ti. at years, they should be pumped out now. <br />DRAINtIELO CONDITION (11.16): <br />Drainfield inspection indicates: <br />11 Dralnfiald is dry, n, surfacing evident. <br />Some evidence of surfacing, not critical yet. <br />Drainfisee lldd is ,"*It, <br />and visibly discharging untreated effluent to the surface. Contact the City Inspector <br />16 Ore�nf laid estent�ard orditiotttunknowwn. be abed within 90 days. <br />)i�llL")fLl�f�:.iiF�[�iIIIl9I�G.• <br />Note: In the event that this Inspection report is -ed to satisfy the requirements for a mortgage or other transfer of <br />property, be advised that this report does net guarantee or c^ tify that en existing system hilt. continue to function <br />properly, but is metely an opinion of the adequacy of the system under current conditions based on the available <br />information. <br />This report not be kept on the premises with the system locsrtm and putpirg records. <br />WNttE COPY h+apeclws EW YELLOW COPY momaomnar <br />