Laserfiche WebLink
8 -FT DEADMAN, TYP. <br />8 -FT DEADMAN, TYP. <br />2'-0„ <br />—13'-6" <br />2'-0" <br />----+4'-01P <br />8 -FT DEADMAN, TYP. <br />TIMBER TIEBACK, TYP. <br />NOTE: 8' MAXIMUM SPACING BETWEEN HEADERS. <br />PROVIDE HEADERS AT CORNERS AND ENDS OF <br />WALLS. <br />TOP OF WALL <br />GRADE AT TOP OF WALL <br />I GRADE AT FRONT OF WALL <br />BOTTOM OF WALL <br />TIMBER WALL TYPICAL ELEVATION VIEW <br />SCALE: NONE <br />12" IMPERVIOUS <br />4'-0" FILL, TYP. <br />6'-0„ <br />8 —0 <br />8 —0 <br />7,-0„ <br />8'— 0 <br />NOTES: <br />1. The timber in the wall must be treated in accordance with all applicable building codes and industry <br />specifications, such as the American Wood Preservers Association (AWPA). <br />2. Dig a trench approximately 14" and 1-2" deeper than the height of the timber, usually 14" deep. Apply <br />1-2" of sand to level the base of the trench. <br />3. Excavate for headers and deadmen into the hill. The size, length and location of headers and deadmen <br />will be design specific. Headers should extend past the wall face 1 % - 2" to add strength and prevent <br />splitting. <br />4. Place and level the first course of timbers using the sand in the trench. Avoid gaps between timbers. <br />5. Lay the second course of timbers over the base course, staggering the seams. Each course should also be <br />set back approximately 1/2" from the course below. <br />6. As each course is added, drive 3/8" galvanized or treated spikes, through to the course below. Spikes <br />should be placed 6-12" from each end with 1-2 additional spikes in the center of the timber. <br />7. Soil should be backfilled behind each course and tamped thoroughly. Place a clean 3/4" angular drainage <br />aggregate 8-12" wide against the wall. A 4" perforated tile should be placed at the bottom of the wall. <br />8. Some subsequent courses of timbers will require headers and deadmen. Headers and deadmen should be <br />placed after each 8' timber in every third course of the wall face or as indicated in the design. <br />9. Headers should be secured to timbers with two spikes in the face of the wall and to deadmen in the soil <br />behind the wall. <br />10. Backfill soil after each course is secured and tamp thoroughly. Compaction behind the wall shall be <br />achieved by at least three passes of a lightweight mechanical tamper, plate, or roller. <br />DESIGN SOILS: SAND, UNIT WEIGHT = 120 LBS/FT3, PHI ANGLE = 30 DEGREES <br />Cross section based on information listed in cover letter. <br />6'-0" <br />12" THICK, MIN. DRAINAGE —III=I <br />8 -FT DEADMAN, TYP. AGGREGATE, TYP. — — <br />REINFORCED BACKFILL 4'— 0 <br />COMPACTED 95% OF MAXIMUM 4'-0" <br />STANDARD PROCTOR DENSITY <br />4 —0 <br />4'-6" <br />8 -FT DEADMAN, TYP.//I,,// . _ -III= <br />4" DRAINTILE OUTLET" AT 30' <br />O.C. AND ENDS OF WALL <br />8 -FT DEADMAN, TYP. <br />3'-0" <br />8 -FT DEADMAN, TYP. / <br />6" X 18" GRANULAR <br />LEVELING PAD, TYP. <br />.Me <br />I�6" MI GRADE <br />n. "f' 6" MIN.. EMBEDMENT <br />PLANS CREATED B i : <br />CREATED <br />PREPARED FOR: <br />PROJECT' NAME <br />SHhE1 <br />\J�J1 OF 1 <br />I hereby certify that this plan, spec, ication, or report was <br />prepared by me. or under my direct supervision, and that I <br />CRITERIUM-SCHIMNOWSKI <br />VALDES LAWN CARE AND <br />2815 CASCO POINT ROAD <br />SCALE: <br />7� <br />AS NOTED <br />O <br />the tate of eMinnesota fessional Engineer under the laws of <br />ENGINEERS <br />SNOW REMOVAL <br />WALL <br />ELEVATIONS) <br />DRAWN BY: <br />PDS <br />161DUNBARWAY PHONE: 651.779.7700 <br />PHONE: 651-239-9920 <br />PROJECT LOCATION <br />DATE: <br />8/24/2022 <br />5.9natire <br />MAHTOMEDI, MN 55115 FAX: 651.779.7114 <br />Paul D. Schimn—ki <br />Typed or Printed Name: <br />pschimno@criterium-schimnowski.com <br />WAYZATA MINNESOTA <br />PROD. NO. <br />22-6589 <br />Date 524/2022 Reg. No. 40126 <br />REVISION BLOCK <br />