Laserfiche WebLink
OP ORONO <br />I� SYSTEii APPROVAL <br />T56,io <br />Permit t <br />Pee $ <br />Entered By <br />The General Contractor will be given a Copy ,JOfthis report and i <br />responsible for its distribution to all sub -contractors. SEPTIC S <br />DESIGN IS NOT CONSIDERED AS APPROVED UNLESS IS SHEET IS ATTACHED <br />LOCATION: <br />PHONE: <br />GENERAL CONTRACTOR: <br />SEPTIC CONTRACTOR: PHOIT � <br />r I E }/ - <br />OWNER: �1-�✓l PHON� <br />C] APPROVED <br />CONDITIONALLY APPROVED: (Note Changes Below) <br />CUP94ENTS : d �`� kT l O'RYr'PmPn )s YP�] LA �' Gr c�-0 0- <br />approvaTO l of �theAInso ctor 0173 7357)• Call forto the pinspe tirovcd ns plans4 hoursoecsamust <br />uance have prior <br />NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br />prior to and after system installation to avoid compaction of the natural soi.. <br />ALL DRAINFIELD AREAS MOST BE FENCED OFF prior to building site excavation and fincing must <br />remain in place until final site grading. Approval to pour foo•.ings will not be granted <br />until the Inspections Department has verified that primary and alternatf: sites are <br />adequately protected. <br />No vEEICULAR TRAFFIC OF ANY RIND (cars, trucks, earth moving equipment, etc.) is allowed <br />within 20' of tested drainfield sites either before or after system construction. This <br />applies to the lot you are working on and all adjacent lots. you could be held liable for <br />damaging sites on neighboring lots. <br />VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE. <br />Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br />Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br />1 � <br />Date Approved <br />By City o£ Orono <br />