Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />MONDAY, OCTOBER 15.2001 <br />(«I0) tfOI-2723 MARK BREWER, 3800 SHORELINE DRIVE, COMMERCUL SITE PLAN <br />REVIEW, 8:19 p.m. - 8:41 p.m. <br />Mark Brewer. Applicant, was present. <br />The Certificate of Mailing and AITidavit of Publication were noted. <br />Weinberger stated the Brewer Chiropractic Clinic in Mound has filed an application for a commercial <br />site plan review to convert the existing non-conforming single family dw elling located at 3800 <br />Shoreline Drive into a clinic. The property is located within the B-S District, with clinics being a <br />permitted use in this district. Weinberger noted no variances are required. <br />Weinberger slated the building has undergone some extensive interior remodeling by Brewer as part <br />of the conversion of the structure from a residential use to a clinic/office use. The remodeling has <br />included making the building handicap accessible per .ADA requirements. The City has issued <br />permits for the interior remodeling, but the creation of a commercial parking lot has triggered the <br />need for a commercial site plan review. The proposed parking lot was partially installed prior to the <br />issuance of permits, and work was slopped by the building inspector pending approval of this <br />commercial site plan review. <br />Weinberger slated the site plan does meet all the requirements of the B-5 Zoning District, w ith the <br />proposed use being an excellent fit for the B-5 District. The primary issues w ith the site is the ability <br />to adequately direct runolT without curb and gutter and the proposed location and direction of the <br />drainage outlet. The City Engineer and Staff are recommending that the parking lot be provided with <br />concrete curb and gutter to provide positive runoff control and that the runoff be directed to the <br />northwest toward the planning Hennepin County stormwater pond rather than eastward toward the <br />future City park site. Weinberger stated the Applicant is proposing to provide eight parking stalls, <br />which meets the minimum requirement. Ihe Applicant has also been in contact w ith the Minnehaha <br />Creek Watershed District, with Ihe MC WD issuing a permit for the proposed plan. <br />Staff recommends approval of the application subject to the follow ing conditions: <br />1.The final design of the parking lot must meet the requirements as specified by the City Engineer, <br />including the installation of curb and gutter to positively direct runoff to its intended end location, <br />avoiding ptential negative impacts to adjacent properties. <br />2. The final stormwater management and drainage plans, including a drainage area map and <br />calculations, must be submitted for review and approval by the City Engineei. and the final <br />stormwater plan must be confirmed as acceptable to the MCWD. <br />3. All other comments noted by the City Engineer, in the letters dated September 27.2001, and <br />October 10. 2001. must be satisfied. <br />Brewer stated he is agreeable to directing the water in the direction recommended by Staff, but <br />indicated he was unaware of the City ’s requirement for curb and gutter. Brewer stated due to <br />financial concerns, he would like to delay installation of curb and gutter. Brewer indicated to install <br />curb and gutter would cost between $10,000 and $12,000. <br />PAGE 16