My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-2001 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2001
>
09-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:32:31 PM
Creation date
2/22/2023 2:28:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
View images
View plain text
■ In(? Line • ffHflIlIt <br />P. O. Bumsnd*. MnfMMti SS337-0611 (952)8904267 • Offic*(953) 7360333 <br />August 21. 2001 <br />CUy of OroBo <br />City Council <br />Planning Commission <br />2730 Kelley Pulcway <br />POBox66 <br />Crystal buy, MN 55323 <br />We received today a copy of a letter from a Karen Cuff, a neigbborofa tot we own at 3551 Livini <br />note that a number of errors are stated. We wish to correct these errors. <br />Road, in Ms. Cuff’s letter wc <br />There is a claim that a number of actions which have taken place over the last several years are the responsibility of “the Builder” i.e.. <br />Fine Line DESIGN group. This is simply not the case. The condition the lot is in today is the condition that we acquired the kM about <br />a year ago. Fine Um CgSlGN group did not demolish the original residence, remove any trees, grind anv stumns. or move any heavy <br />equipment on or off of this lot. <br />Fine Line DESIGN group is charged with creating a drainage plan and creating a lesidetice that meets City Code and State law. We <br />haNO done this, and provide copies to the Cit>- for Staff review. <br />Ms. Cuff slates that “the builder has not displayed any thoughts of the alteration effects on the neighborhood at this point”. Wenote <br />that any construction we do will have the benefit of improving the existing oonditions. We also took into account dw scale and style <br />of homes existing in the iteighborhood as well as all applicable City Codes before preparing the residence submitted for permit. <br />Ms. Cuff states that “the proposed house has approximately three limes the hardco\er as the original house”. We preseiited hardcover <br />calculations showing our design complies with the allowed 3 5% maximum hardcover requirement. In addition, the residence <br />complies with the allowed 15% structural co\’etage requirement. <br />Wc wish to construct a residence that will have a positive impact upon the Navarre Heights neighborhood. <br />Sincerely, <br />Steven K. Behnke. President <br />^ec'd
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).