My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
08-20-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:32:08 PM
Creation date
2/22/2023 2:25:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, July 16,2001 <br />(#01*2696 ABC Supply Company, Inc., Continued) <br />Fritzler indicated that a police ofTiccr could ask an idling truck to move to the other side of the <br />building to the Drop Ship parking lot if he was aware of the regulation. Most of the time, the truck <br />driver would move his truck. If the truck driver refuses to move, the police could possibly issue a <br />citation for violation of the noise ordinance. <br />Stoddard felt that with a property the size of ABC’s, there should be a way to address the parking <br />issues. <br />Hawn referred to the bituminous parking. Jeziorski confirmed that the employee parking would be <br />bituminous. Gaffron referred to the parking setback issue and the possibility of a variance request. <br />Jeziorski confirmed that there was a ma.ximum of 12 employees which would require 12 employee <br />parking spaces. Stoddard asked if there was a way to avoid a variance by getting the employee <br />parking inside the gated area. Jeziorski replied that they are still working on the plans. GalTron <br />asked if there was any possibility of leasing more space to the south of the outside sto" age. Jeziorski <br />stated they were looking at options for employee parking and fencing. <br />Jeziorski addressed the flood light issue. He stated that it was only used for emergencies and would <br />only be used during business house. Planning Commission members did not object to use for <br />emergencies. <br />Mabusth asked how many delivery trucks ABC has in the storage area. Jeziorski replied there are <br />four trucks - one semi, two cranes, and one conveyor truck. He added that they were currently- <br />stocked at their ma.\imum capacity because of the busy construction season. Inventory is greatly- <br />reduced from November to March. Employees are also reduced to 6 or 7 in the w inter. <br />Jeziorski stated that if the application were tabled, he could prepare a landscape plan w ith the berm <br />and trees. Hawn requested that he also work on a parking plan without variances. <br />Smith asked if the new Highway 12 plan would affect their business. Jeziorski replied that ABC was <br />not a destination for that traffic since they work with contractors and deliver the product to job sites. <br />Hawn moved. Lindquist seconded, to table Application #01-2692. ABC Supply Company, Inc., 2765 <br />Wayzata Boulevard, requesting a conditional use permit to allow outside storage. <br />Ayes 7, Nays 0. <br />PLANNING COMMISSION COMMENTS <br />(#9) REPORT OF PLANNING COMMISSION REPRESENTATIVES ATTENDING <br />COUNCIL MEETINGS JUNE 25,2001 AND JULY 9,2001 <br />Smith stated she auended the June 25"' Council meeting and commented that the Council reviewed <br />the same issues as the Planning Commission regarding the BayWind Church application and came to <br />the same conclusions as the Planning Commission. <br />PAGE 18
The URL can be used to link to this page
Your browser does not support the video tag.