My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2001 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2001
>
02-21-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:24:02 PM
Creation date
2/22/2023 2:23:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMPP«rt3B. L«»dU»ePUn <br />to the noith side of Highway 12 for commercial development At that <br />time, the City was not clear about the type of commercial <br />development that should be planned for this area. Through joint <br />discussions with the Ci^ of Long Lake regarding development along <br />Highway 12, the City has determined that the optimum development <br />in this area would be office development. Office development can <br />provide services for Orono residents, can provide facilities for <br />businesses owned by Orono residents, and can provide quality <br />employment opportunities. The development of this area for office <br />use versus retail use enables the Highway 12 retail area to remain a <br />more compact pedestrian-fnendly retail area versus a non-cohesive <br />extended strip of retail development. <br />Access to all office uses will be via a service road connecting Willow <br />Drive and Old Crystal Bay Road, with no direct access points onto <br />Highway 12. Development of this service road began in 1991 with <br />the extension of Kelley Parkway eastward from Old Crystal Bay <br />Road. <br />The City’s intent is to have a single tier of office uses between Kelley <br />Parkway and Highway 12, with primarily residential uses north of the <br />service road. Due to construction of a stormwater retention pond by <br />MnDOT midway between Old Crystal Bay Road and Willow, and the <br />City’s intent to develop the area north of the service road residentially <br />at a density of 2-6 units per acre, the opportunities for large office <br />sites are limited. As many as six 2-2.S acre office sites can be <br />developed along the Highway 12 frontage while still allowing the <br />intend^ residential development to occur. <br />This area is guided for office use with minor retail and service uses <br />allowed only as accessory uses to the office use. **Big box” retail uses <br />will not be allowed within this area. <br />City ofOroDO CoDDBolty Maaagemtol Plan <br />S«yMib<r_,2tN <br />Pag«3B^0
The URL can be used to link to this page
Your browser does not support the video tag.