My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
02-21-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:24:02 PM
Creation date
2/22/2023 2:23:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMlSSfOM <br />Wednesday, January 17,2001 <br />(112650 Kristen and Patrick Burton, Continued) <br />Weinberger stated technical!) a variance is required for the guest house because Orono's Code <br />states that the maximum buildmg height for structures u two and a half stones or 30 feet in <br />height The building would require a variance for height becauK part of the house is three ftill <br />stories One-half stor>' would be the portion of living space within a gabled roof Because the <br />architectural st>le has a flat roof, it leaves a full three story house 30 feet ui height. <br />Weinberger stated a second variance is required for a 30 inch high railing that would be located above <br />tlic roof line. The railing wo*ild be placed on the roof for safety purposes A variance is required <br />because the railing is considered part of the structure over 30 feet m height <br />Weinberger stated as it relates to the primaiy residence, the proposed chimney is for a total of <br />six feel in height where two feet would be allowed The Building/Fire Code requires chimneys <br />to be two feet higher than any portion of the house w ithin 10 feet The added four feet of height <br />requires the conditional use permit. <br />Cit)’ Staff IS recommending approval of the application Weinberger noted the septic design work <br />would need to be approved b> the septic inspector prior to a building permit being issued <br />Kluth inquired w hether an>' of the parties had anvthing to add to Staff s report <br />Peterson stated he is satisfied with Staff s report, noting Weinbeiger did an excellent job presenting <br />his application <br />Gaflfron commented from the plans presented it appears the residence mcei-* the 30 foot side yard <br />setback <br />Baldwin stated the long building has been rotated somewhat in a more nonh'souih direction and <br />50 feet to the north to improve tlic neighbor's view <br />Dave Daniels, 710 Gander Road, stated he is opposition to this project Daniels stated there <br />has already been constructed two significant roads into each one cf the building sites os well as <br />some site preparations Daniels questioned whether the property owner was getting ahead of the <br />permit process <br />Kluth stated Orono codes do allow guest houses to be constructed on a resident's property if <br />it exceeds a certain acreage <br />Bellows inquired v.hy the property owner would like to construct a guest house. <br />Baldwin stated the property owner would like to move into the guest house while the construction <br />of the principal residence is ongoing Baldwin stated the guest house will be used as the primary <br />residence for a short period of time w hile construction is ongoing <br />Peterson stated they will be constructing the guest house first <br />Bellows noted the guest house does qualify* as a principal residence so in her view there is not a <br />problem with the guest house being constructed first. Bellows suted the issue relating to height <br />PAGE 23
The URL can be used to link to this page
Your browser does not support the video tag.