My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
01-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:31:49 PM
Creation date
2/22/2023 2:22:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
List of Tables <br />1.1 <br />1.2 <br />Recent Population Projertions <br />Surface Water Jurisdiction <br />4.1 <br />4.2 <br />4.3 <br />4.4 <br />4.5 <br />4.6 <br />Runoff Coefficients <br />Phosphorus Concentrations and <br />Export Coefficients <br />Benefits of Wet Detention Ponds <br />Bioretention and Media Filtration <br />Methods <br />Mechanical Devices <br />Lake Frontage Techniques <br />OtyofOrono <br />MDnnStMf9ce\VaUrMansgcfnentPUn <br />7.1 <br />7.2 <br />7.3 <br />7.4 <br />7.5 <br />7.6 <br />7.7 <br />7.8 <br />7.9 <br />Water Quality Evaluation Strategy <br />Baseline Water Quality Strategy <br />Water Quality Monitoring Strategy <br />New Development / Redevelopment <br />Strategy <br />Developed Areas Strategy <br />Roadside Discharge Strategy <br />Ravine Stabilization Strategy <br />Phosphorus Reduction Strategy <br />City Staff Education Strategy <br />7.1 0 Residents' Education Strategy <br />fi <br />5.1 Buffer Strips per Wetland Size 7.11 Public Involvement Strategy <br />5.2 Funalonal Values Under the New 7.1 2 Developers' Education Strategy <br />Hampshire Method 7.1 3 System Costs by Drainage District <br />5.3 Wetland Protection Strategies 7.1 4 Water Quality Projects <br />5.4 Project Cost for Wetland PC-L-31 7.1 5 Water Quantity Projects <br />5.5 Project Cost for Welland PC-M-31 7.16 Wetland Restoration Projects <br />5.6 Project Cost for Wetland LL-C-26 7.17 Priority Resources <br />5.7 Project Cost for Wetland SB-E-31 7.1 S Priority CIP Projects — <br />6.1 Major Drainage Districts 7.19 CIP Summary <br />7.20 Adjusted Trunk Fees <br />7.21 Water Quality Trunk Fees — <br />7 22 Grant'Cost-Sharing Opportunities « <br />List of Fiaures List of ADoendices <br />1.1 Location Map A. Drainage Areas <br />B. Existing and Proposed Pipes <br />4.1 Precipitation Frequency Curve C. 100-Year Pond Design — <br />4.2 Residential Hydrograph and Orifice D. 1- and 10-Year Pond Data <br />Outlet Rating Curve E. Water Quality Pond Data <br />4.3 Typical Pond Inflow and Outflow F. System Cost Estimates <br />Hydrographs C. Water Quality Design Criteria <br />4.4 Pond Planting Plan H. Wetland Stormwater Susceptibility <br />4.5 Water Quality Alternatives Graph 1. Wetland Functions and Values <br />7.1 Alternative Methods Flowchart — <br />7.2 New Development Flowchart <br />7.3 Structure Expansion Flowchart <br />“ \ <br />TMeof Contents
The URL can be used to link to this page
Your browser does not support the video tag.