My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
01-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:31:49 PM
Creation date
2/22/2023 2:22:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWMP <br />Januar>’ IK2001 <br />Page 3 <br />Chapter 7 discusses impIcmcnUtion strafegicf: <br />o Water quantit}' manaRcment s>*stem - the system ofsiomi sewers, ditches, swales. <br />emergency ONxrflows and ponds to collect store and convey surface water, <br />o Water quality management system - a holistic approach that requires water quality <br />monitoring, public education and involvement, and strategies for determining <br />appropriate management alicmalives for various development conditions, as well as <br />a system of water quality ponds. A wide range of activities is suggested, noting that <br />water quality management requires community cooperation. Note that hardcover <br />management is only a ver>* minor component of this plan...we will be conferring with <br />the people at Boncstroo as to how a discussion of our hardcover standards can be <br />added to the Plan text. <br />o A cost estimate for completing the system is provided, including a 5-year Capital <br />Improvement Plan (CIP) totaling approximately $2 million (sec pages 7-20 thru 7- <br />25). Total long term cost of the system is expected to be around SI 1 million, <br />o Methods for financing construction of the system are discussed, summarized as <br />follows: <br />New Development 1) Developer construction of system or components; and/or <br />2) Trunk Fee on a pcr-acrc basis for regional system impacts, <br />adjusted for land use type <br />Expansion of <br />Existing Structure <br />Partial Trunk Fee based on impacts and site ability to obtain 60% <br />nutrient removal <br />IXw eloped Areas 1) Direct assessment of contributing/benefitting properties <br />2) Stormwater Utility Fee - an annual fee charged to all properties <br />based on the amount of stormwater runoff generated by the property <br />A number of grant programs for surface w atcr management act i v ities or s\ stem construction <br />arc also identified. <br />• Chapter 8 includes a summary and recommendations for the Council ’s consideration. <br />• Appendices A thru I contain the data for each drainage area, proposed s> stem parameters and cost <br />estimates, wetland data, and a complete Surface Water System map. (The appendices arc rather <br />voluminous and have not been copied in their entirety for you, but can be made available if you want <br />to rc\ icsv a specific drainage area) <br />Aside from a few paragraphs that staff proposes be added (primarily in the introductory* sections) to <br />more clearly establish Orono ’s historic philosophy on slomuvalcr management as related to the <br />protection of Lake Minnetonka, the Plan is complete.
The URL can be used to link to this page
Your browser does not support the video tag.