My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
01-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:31:49 PM
Creation date
2/22/2023 2:22:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Rd)uild existing stone steps (teal color on survey, marked *E') on the west side of the <br />house to miinuin a uniform width of 30”. Existing steps vary from 18 to 30 ” (see <br />photos for Section E, pages 10-N). More stone steps (coral) will be built to extend <br />the steps to the driveway, maintaining a 30” width The steps will be built with dry <br />laid bluestone flagging for the tread and bluestone boulders for the rise (see example <br />photos for Section E page 1 1). Proposed improvement results in an addition to <br />hardcover area of 65 84 square feet <br />F. Repair existing brick retaining walls (dark orcotge on survey, marked 'F') on east and <br />west sides of house (see photos for Section F, pa^ 12). Remove small limestone <br />wall on east side, dig frost footing and replace with a low brick wall that is <br />incorporated into the adjacent brick wall. Please note the following: I.) The survey <br />identifies the west wall as stone, but it is a brick mortared. 2.) Existing limestone <br />wall on east side does not overlap brick wall as shown on survey. Proposed <br />improvement results in no additions to hardcover area. <br />G. Remove concrete retaining wall by boathouse and replace with a tiered, dry laid <br />bluestone boulder wall (blue color on surwy, marked 'G ) (See drawings and photos <br />for Section G, page 13). This will be the same type of wall as what is proposed for <br />Section D (see example photos and drawings for section D, page 9). Proposed <br />improvement results in an addition to hardcover area of9 84 square feet. <br />R Repair stone walk by boathouse (yellow color on surxey, marked '// V (see photos for <br />Section H, page 13). Please note that the survey identifies this as a concrete walk, <br />however, it is a stone path. Proposed improvement results in no additions to <br />hardcover area <br />1 Install portable, tiered fountain with gravel base by boathouse (green color on survey, <br />marked V ’) (see thawing and photos for Section /. pages 14-16). Proposed <br />improvement results in an addition to hardcover area of 6.12 square feet. <br />j. Install portable, 9’x 3’ cistern fountain with gravel base by patio (rust color on <br />suney, marked *J') (see photos for Section J. pages / 7-18). Proposed improvement <br />results in an addition to hardcover area of 27 square feet. <br />I!
The URL can be used to link to this page
Your browser does not support the video tag.