My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
01-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:31:49 PM
Creation date
2/22/2023 2:22:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 10.53 is the Code section that defines the standards and review process for a Highway 12 <br />PUD and Section 10.52 defines the special requirements for rezoning along the I lighway 12 corridor <br />and study area. Those Code sections have been attached as exhibits to this report. <br />General Concept Approval <br />The General Concept Approval is required as part of the Highway 12 PUD rezoning and <br />development plans. A General Concept Approval would be similar to a Preliminary Plat approval <br />without actually giving the Preliminaiy Plat until other issues have been resolved. A resolution <br />could be adopted by the Council for the Concept Approval with all conditions that must be met by <br />the developer for the Plat approval. The City is noj in a position to approve the rezoning or plat until <br />a TIF option is approved by the Council. State laws require notification and public hearing for a <br />Til* that would not be hearf by the Council until this Spring. Conditions of the General Concept <br />Approval would include that the financing be approved and the Council adopt the RPLD zoning <br />district with the final development plans. <br />Review of Issues Discussed Previously bv the Planning Commission and City Council <br />The Orono Council did recommend the applicant proceed with the request to the Planning <br />Commission for General Concept Plan approval. 1 he primary cliangcs to the proposal since the <br />November review are the total units in the senior building have been reduced from 70 to 62 a trail <br />connection has been added to the plans to provide connections to the regional trail s\stern, the <br />senior building has been relocated further to south to minimize impacts to the residential properties <br />he north, and the through street has had the tsvo sided parking aretu relocated to avoid hacking <br />out into through traffic. <br />Idle applicant has provided site plans for Knh properties. A commercial site plan review for the <br />office and senior housing properties and buildings will include a full review of the following items: <br />1) <br />2) <br />3) <br />4) <br />5) <br />6) <br />7) <br />Landscaping <br />Traffic Flow/Road System <br />Parking Arrangement <br />Building I leight/Setbacks <br />Review of Architectural Materials^uilding Design <br />I.ighting <br />Screening <br />I. PrcUniaary Subdtviskm/KrzoiiiBg/CoBprchrnsivc Pbn Amcadmeni <br />Uses within the PUD may include only those uses designated by the official Comprehensiv e Land <br />Use Plan. The 1989 Comprehensive Plan Amendment had guided the property for commercial use. <br />The Comprehensive Plan (CMP) as preliminarily approved by the City Council in Scpiemlvr <br />designated several Orono properties as areas that would allow medium density. The density <br />proposed in the CMP does not have an existing zoning district that would allow the types of housing <br />that would be offered by as proposed in this application. The proposed CMP did not include this <br />property as a residential site. In fact it has been guided for commercial use as was the case with 1989 <br />Orono Kmkm. LLC <br />:060 V»i>/au Boulevard <br />»364ai264l <br />r^3or 7 J
The URL can be used to link to this page
Your browser does not support the video tag.