My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
01-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:31:49 PM
Creation date
2/22/2023 2:22:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i>nNUTESOFT^IE <br />ORONO PLANNING CO>LMISSION MEETING <br />Monday, November 20,2000 <br />(1^2640/2641 ORONO AMBAR, Continued) <br />Weinberger stated they are proposing to rczone this propert>% which requires a comprehensive <br />plan amendment to change the guided land use designation for at least Lot 2. The rezoning <br />would allow Lot 1, which is proposed to have a 23,000 square foot office building constructed <br />on it, to be rezoned to the B-6 District. The second rezoning would be to rezone Lot 2 to the <br />RPUD, which w ould establish standards for a multi-family residential senior use of the building. <br />The Applicant is proposing to construct a three-nor>*, 70 unit senior housing facilit)*. The <br />housing would be similar to other senior housing facilities Weinberger stated the 1980 <br />Comprehensive Plan and the revised Cemprehensive Plan has this area guided for commercial <br />use. The proposed senior housing would not fit under this designation, which results in the <br />need for a comprehensive plan amcndrr.ict for Lot 2. <br />Weinberger staled Section 10.53 defines the standards and review process for a Highway 12 <br />PUD, which is really the umbrella for this process being put in place to allow rezoning to occur <br />on this properQ'. Weinberger noted Section 10.52 defines special requirements for rezoning <br />along the Highway 12 corridor. <br />The Applicant has provided site plans for both projects. Weinberger noted a site plan review <br />is required for each individual lot. Corrjnerctal site plan will tvpically inv olve all of the reviews <br />that arc t>pically involved in any ivpc of site plan rev lew, including such things as landscaping, <br />parking, lighting, traffic flow, building height, setbacks, architectural matenals, screening, and <br />any other design or use issues that c.vis: <br />Weinberger noted this is a preliminarv p!a: application, which also involv es replatting and <br />subdiv ision of the tw o lots. Lot 2 consists of appro\imately four acres in size and would house <br />the senior housing facility. The 70 units would result in a density of 17.5 units per acre on the <br />propertv, which is higher than any other zoning district within the City of Orono, therefore <br />the RPUD ordinance would apply in this case. The RPUD would rely heav ily on the <br />Comprehensive Plan designation for the lot to guide the lot towards the tvpe of uses and <br />densities that would be allowed on this property. The RPUD would also provide those incentives <br />that arc consistent with Orono's housing goals ar.d includes modifications to regular density <br />requirements The housing goal in this case is to prov idc moderately priced senior housing. <br />Weinberger stated the office use being proposed for Lot 1 would not require a comprehensive <br />plan amendment since the underlying land designation is for commercial use for the entire <br />site. Lot 1 consists of 2.1 acres Weinberger noted the Applicant arc looking for a cone* “ual <br />plan review and approval at this time <br />Weinberger stated the preliminary plat would fall under the preliminary plat standards Because <br />litis is a non-residential plat, the Citv has the option of applying additional requirements that the <br />City would help this development fit within the neighborhood and to protect adjacent areas from <br />any nuisance uses on the property. Weinberger fiated some of those provisions would include <br />permanent landscape buffer strips and anv other additional Kreening or design elements that <br />would help it fit into the neighborhood bencr. <br />The Applicant is proposing to plat Lot 1 as an individual lot. Lot 2 would be platted creating <br />a building with 70 units, which would be accomplished by crying 70 separate tax parcels and <br />PAGE 24
The URL can be used to link to this page
Your browser does not support the video tag.