My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Packet
Orono
>
Planning Commission
>
2001
>
01-17-2001 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 2:31:49 PM
Creation date
2/22/2023 2:22:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memo <br />i( i Ocnniroo <br />Hotcne <br />«rjB A.'vJ«t1A c <br />|\|| Auod«tes <br />AnMitni <br />Project Name: Orono Apartments Traffic Review <br />To: <br />From: Bryant Ficek <br />Re: Traffic Flow for the Orono Apartments <br />Client: City of Orono <br />File No: 139-98-000 <br />Date: 11/07/00 <br />The proposed Orono Apartments will be located in the northwest quadrant of the intersection of Tnmk <br />Highway (TH) 12 with Brown Road North in Orono, Minnesota. No development currently exists on this <br />site. The current site plan, dated October 17,2000, shows hvo buildings. One building is proposed to be an <br />apartment complex with 70 dwelling units and would be located on the cast side of the site, next to Brown <br />Road North. The other building is proposed to be an office building with approximately 23,200 square feet <br />of area and would be located on the west side of the lot. <br />Using the Institute of Transportation Engineers’ trip generation rates for developments of this kird, the <br />following table shows the estimated traffic volumes to and from the site. <br />Time Period <br />Office 1 <br />In <br />luilding <br />Out <br />Senior I <br />In <br />dousing <br />Out <br />Total Site <br />In <br />Trip Ends <br />Out <br />Averaee Weekday 130 130 120 120 250 250 <br />am Peak Hour 30 5 5 5 35 1C <br />PM Peak Hour 5 30 5 5 15 35 <br />Average Saturday 30 30 90 90 120 120 <br />Average .Sunday 10 10 95 95 105 105 <br />As shown in the table, the site could expect about 250 vehicles in and 250 vehicles out of the site during a <br />l)pical weekday according to the size and t>pe of these dcvelopr..ents. <br />Site Access <br />The current site plan shows the three access drives to and from the proposed development. T^c first access <br />drive connects to Brown Road North on the east side of the lot. We would recommend aligning this site <br />access drive, if possible, with the access to the bar\k and private homes on the east side of Brown Road <br />North, creating one four-legged intersection rather than two closely spaced *T’ intersections. One lane in <br />each direction on the access drive should suffice for the expected amount of traffic. From this full access <br />driveway, motorists could continue south to the existing full access intersection of Brewm Road North with <br />TH 12. Motorists should expect delays at this intersection of Brown Road North and TH 12 due to the <br />traffic volumes on TH 12. We would not recommend a signal at thisTH 12 intersection since other nearby <br />intersections in both directions on TH 12 have existing signals. The current geometries at this TH 12 <br />intersection are also a.*-quate for the expected amount of traffic. <br />Bonestroo. Rosena, AnderTk and Assoefatas <br />2335 WestKiahwa/36-»^ St. Paut,MN531l3-»> Phone: 651-636-4^00 ♦ Fax:651-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.