My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-18-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
11-18-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 12:12:34 PM
Creation date
2/22/2023 12:11:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Road. The trucks will drive to the site, drop the fill and back out onto North Shore Drive to BrowTi <br />Road. The trucks will not be driving up and down Bay Ridge Road. <br />Engineer/Public Works Comments: <br />The City Engineer and Public Works Director have met with (he applicant and reviewed the new <br />plan. Neither have any issues or concerns with the redesign. <br />Neighborhood Concerns: <br />At the October PC meeting a number of neighbors e.xpressed concern about the berm and its impacts <br />on the neighborhood. It should be noted that; <br />- the only neighboring property whose lake views are protected is the residence to the south, <br />which will not be impacted. <br />- in the 2-acre and 5-acre zones, allowing the berm to remain unmowed would not be violation <br />unless it generates complaints that result in City determining it is a public nuisance.... <br />- applicant intends to maintain the buffer of trees along the north boundar> of the site. <br />- Neighborhood drainage pattern will not be negatively impact by the berm. <br />Staff Recommendation: <br />Staff recommends approval with the following conditions: <br />1. <br />2. <br />3. <br />4. <br />5. <br />The applicants must obtain a land alteration permit from the city prior to hauling fill <br />to the site. <br />The applicants must contact Minnehaha Creek Watershed District for an erosion <br />control permit. <br />Erosion control measures shall be taken by installing a silt fence a-ound tlie <br />construction area as shown on the revised plan upon receiving permit frorr' Citv and <br />MCWD. <br />A route map shall be provided to the city prior to the start of construction showing <br />which county/city streets are to be used. <br />Berm must have vegetation re-established immediately upon finished grading. <br />W02-2834 Rob Wiens <br />1425 Bay Ridge Road <br />November 15,2002 <br />Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.