My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
10-21-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 12:15:12 PM
Creation date
2/22/2023 12:10:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Traffic: Our turning movement template indicates a WB-50 truck (typical moving van) will not pass through the <br />roundabout. It appears the street would need to be widened by 4-feet to allow the WB-50 turning movement. The <br />roundabout should be redesigned to accommodate a WB-50 truck. Another possible solution short of widening the <br />^ curb along the inside nulius of the roundabout with a 4-foot wide concrete <br />side^ behind the curb. The rear ^es of the WB-50 truck would ride on the sidewalk and the turning movements <br />could be accoounod-ited without dismrbing any landscaping. This latest version of the plans has added another <br />access onto Kelley Parkway near the west end of the project We would strongly discourage the addiuonal access <br />Md would encourage a redesign of West CircIcAVest Lane that provided two accesses onto Kelley Parkway rather <br />than the three shown. The West Lane access onto Kelley Parkway should be constructed 28-feet wide face-to-face. <br />6. Site Grading: The overall site plan should include an earthworks summary to quantify the proposed cut and fill <br />Retaimng walls over 4-feet in height require a separate engineered design submittal. <br />7. Finwclal Guarantee: When final plans have been completed we will prepare an estimate of the total cost for the <br />site unprovements to determine the amount of the financial guarantee required. <br />8. General: All utility and street construction shall be in accordance with City engineering standards. Future half size <br />plan submittals should be scaleable. <br />Please contact me at (651) 604-4863 if you have any questions regarding this matter. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />/cyyy^ <br />Tom Kellogg <br />Cc: Greg Gappa, City of Orono
The URL can be used to link to this page
Your browser does not support the video tag.