My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
10-21-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 12:15:12 PM
Creation date
2/22/2023 12:10:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />^02-2840 Dahlstrom Development LLC <br />FINAL DEVELOPMENT PLAN SUBMITTALS for STONEBAY <br />Revised List October 18,2002 <br />/0 ’/9-0Z. <br />Plan Sheets: <br />Sheet <br />Indei No. Title <br />C5.1 Preliminary Plat incl.future phases <br />(1 *4 of 4) Final Plat Drawings <br />Sheet <br />Inden No. Title <br />AU <br />A1.2 <br />A1.3 <br />A2.1 <br />A2.2 <br />A3.1 <br />A3.2 <br />CO.l <br />CM <br />C2.1 <br />C2.2 <br />C2.3 <br />C3.1 <br />C3.2 <br />C3.3 <br />C3.4 <br />C3.5 <br />C4.I <br />C4.2 <br />C4.3 <br />C4.4 <br />C4.5 <br />C4.6 <br />Rambler Townhnme Drawim^s: <br />Typical Plan and Elevation <br />Typical Roof Plan and Elevation <br />Typical Elevations <br />Two Story Townhome Drawinffx: <br />Floor Plans and Roof Plan <br />Elevations <br />Lofts Drawings'. <br />Roof Plan and Floor Plan <br />Elevations <br />General <br />Title Sheet <br />Existing Conditions <br />Site Plan (See 10/18 Exh. C-1) <br />Preliminary Design Guideline Plan <br />Preliminary Design Guideline Plan <br />Grading and E osion Control <br />Master Grading Plan <br />Pond Grading Plan & Details <br />Central & West Lanes Grading Plan <br />Northwest Lane Grading Plan <br />Grading Details <br />Sanitary Sewer dc Water Plans/Proftlp^ <br />Master Utility Plan <br />Kelley Parkway (east halO <br />Kelley Parlway (west halO <br />Central Lane <br />Northwest Lane <br />West Lane <br />C4.7 <br />C4.8 <br />C4.9 <br />C4.10 <br />C4.I1 <br />C7.1 <br />C7.2 <br />C7.3 <br />L2.1 <br />L2.1A <br />L..2 <br />L6.1 <br />L6.IA <br />L6.2 <br />L6.2A <br />L6.3 <br />L6.4 <br />L6.5 <br />L6.6 <br />L6.7 <br />L7.1 <br />L7.2 <br />L7.3 <br />Streets & Storm Sewer Plans/PrnfitpK <br />Kelley Parkway (cast halQ <br />Kelley Parkway (west ha 10 <br />Central Lane <br />Northwest Lane <br />West Lane <br />Utilities/Roads/Etc. Construction Detaih <br />Construction Details <br />Construction Details <br />Construction Details <br />Landscape Plans: <br />Overall Landscape Plan <br />Phase 1 Landscape Plan <br />Seed Mixture and Erosion Control Plan <br />Kelley Parkway (West) Enlarged Plan <br />Phase 1 Kelley Parkway (West) Enlarged Plan <br />Kelley Parkway (East) Enlarged Plan <br />Phase I Kelley Parkway (East) Enlarged Plan <br />Main Entry Landscape Enlarged Plan <br />Roundabout Landscape Enlarged Plan <br />Open Space Enlarged Plan <br />Northwest Lane Enlarged Plan <br />Willow Drive Enlarged Plan <br />Landscape Sections <br />Landscape Sections <br />Landscape Details <br />Miscellancotts Exhibits: <br />M-1 Final Dev. Plan Submittal Letter - September 18, 2002 <br />M-2 Affordable Housing Proposal - September 18,2002
The URL can be used to link to this page
Your browser does not support the video tag.