Laserfiche WebLink
c. <br />CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. - <br />J**® plans and specifications shall <br />1) Final plans ^d specifications for all proposed utility lines and <br />ser^ces, including any proposed revisions to existing service <br />facilities. Proposed plans shall be provided to the City for final <br />review Md approval with the Preliminary Plan set. The Public <br />orks Department and MnDOT shall review and approve all utility <br />improvements. Final sanitary sewer and watermain plans shall be <br />Depatoen^t ”** subject to approval by the Public Works <br />2) Final grading, drainage and erosion control plan showing existimt <br />and proposed contours, building locations, elevations, stormwater <br />facilities md calculations, utilities and erosion control measures <br />to be used duimg construction. Development Plan Approval will <br />Minnehaha Creek Watershed District and <br />MnDOT have approved the stormwater plans. <br />3) Final landscaping design plan Nvith planting schedules includimt <br />numbers and species, in accordance with the landscapine <br />requirements of the B-6 zoning district. <br />1) Final building construction plans, including; <br />a) elevations of all sides of the building; <br />type and color of exterior building materials; <br />proposed floor plan; <br />b) <br />c) <br />d) building dimensions; and <br />e) the location of trash and recycling containers and of heating <br />Ventilation and air conditioning equipment. <br />Page 8 of 12