My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
02-21-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 11:46:18 AM
Creation date
2/22/2023 10:19:30 AM
Metadata
Text box
ID:
1
Creator:
Created:
2/22/2023 10:22 AM
Modified:
2/22/2023 10:22 AM
Text:
Complete upper tier as planned. Increase wall height as needed up to 4-feet at each end.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8 -FT DEADMAN, TYP. <br />8 -FT DEADMAN, TYP. <br />2'-0„ <br />---43'— 6" <br />2'-0" <br />�-4'-0" <br />8 -FT DEADMAN, TYP. <br />TIMBER TIEBACK, TYP. <br />NOTE: 8' MAXIMUM SPACING BETWEEN HEADERS. <br />PROVIDE HEADERS AT CORNERS AND ENDS OF <br />WALLS. <br />TOP OF WALL <br />GRADE AT TOP OF WALL <br />12" IMPERVIOUS <br />4'-O" FILL, TYP. <br />..,, ,� <br />8 —0 <br />8'— 0 <br />7'-0„ <br />8'— 0 <br />NOTES: <br />1. The timber in the wall must be treated in accordance with all applicable building codes and industry <br />specifications, such as the American Wood Preservers Association (AWPA). <br />2. Dig a trench approximately 14" and 1-2" deeper than the height of the timber, usually 14" deep. Apply <br />1-2" of sand to level the base of the trench. <br />3. Excavate for headers and deadmen into the hill. The size, length and location of headers and deadmen <br />will be design specific. Headers should extend past the wall face 1 % - 2" to add strength and prevent <br />splitting. <br />4. Place and level the first course of timbers using the sand in the trench. Avoid gaps between timbers. <br />5. Lay the second course of timbers over the base course, staggering the seams. Each course should also be <br />set back approximately 1/2" from the course below. <br />6. As each course is added, drive 3/8" galvanized or treated spikes, through to the course below. Spikes <br />should be placed 6-12" from each end with 1-2 additional spikes in the center of the timber. <br />7. Soil should be backfilled behind each course and tamped thoroughly. Place a clean 3/4" angular drainage <br />aggregate 8-12" wide against the wall. A 4" perforated tile should be placed at the bottom of the wall. <br />8. Some subsequent courses of timbers will require headers and deadmen. Headers and deadmen should be <br />placed after each 8' timber in every third course of the wall face or as indicated in the design. <br />9. Headers should be secured to timbers with two spikes in the face of the wall and to deadmen in the soil <br />behind the wall. <br />10. Backfill soil after each course is secured and tamp thoroughly. Compaction behind the wall shall be <br />achieved by at least three passes of a lightweight mechanical tamper, plate, or roller. <br />DESIGN SOILS: SAND, UNIT WEIGHT = 120 LBS/FT3, PHI ANGLE = 30 DEGREES <br />Cross section based on information listed in cover letter. <br />:.::0� <br />6'-0" <br />12" THICK, MIN. DRAINAGE -III=I <br />8 -FT DEADMAN, TYP. AGGREGATE, TYP. - - <br />REINFORCED BACKFILL 4'— 0 <br />COMPACTED 95% OF MAXIMUM IN 4'-0" <br />STANDARD PROCTOR DENSITY <br />4 —0 <br />4'-6" <br />8 -FT DEADMAN, TYP. ,.. _ -I I I= <br />4" DRAINTILE OUTLET AT 30'// <br />O.C. AND ENDS OF WALL <br />3'-O" <br />4'-- O <br />GRADE AT FR NT OF WALL <br />BOTTOM OF WALL <br />3'-0" <br />— <br />8 -FT DEADMAN, TYP. <br />=III <br />TIMBER WALL TYPICAL ELEVATION VIEW <br />SCALE: NONE <br />" <br />-0 <br />4 —0 31 <br />FINISHED GRADE <br />6" MIN. EMBEDMENT <br />8 -FT DEADMAN, TYP. <br />6" X <br />18" GRANULAR <br />LEVELING PAD, TYP. <br />PLANS CREATED BY: : <br />CRITERIUM—SCHIMNOWSKI <br />ENGINEERS <br />161 DUNEAR WAY PHONE: 651.779.7700 <br />MAHTOMEDI, MN 55115 FAX: 651.779.7114 <br />pschimno@criterium-schimnowski.com <br />PREPARED FOR: <br />VALDES LAWN CARE AND <br />SNOW REMOVAL <br />PHONE: 651-239-9920 <br />PROJECT NAME <br />2815 CASCO POINT ROAD <br />WALL <br />ELEVATION(S) <br />SHEET: <br />�z 711 OF 1 <br />YY 1 <br />I hereby —Hy that this plan, sp—featon, or report was <br />prepared by me. or under my direct supervision, and that I <br />a duly Licensed Professional Engineer under the laws of <br />the State of �eso�. � <br />the <br />SCALE: <br />As NOTED <br />DRAwNBY: <br />PDS <br />PROJECT LOCATION <br />WAYZATA MINNESOTA <br />DATE: <br />8/24/2022 <br />5"J-tnre <br />- Paul D. Schimnowski <br />Typed or Printed Name: <br />Date 824/2022 Reg. No. 40126 <br />PROD. NO. <br />22-6589 <br />REVISION BLOCK <br />
The URL can be used to link to this page
Your browser does not support the video tag.